My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-07-11_PERMIT FILE - M2007044
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2007044
>
2008-07-11_PERMIT FILE - M2007044
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:34:32 PM
Creation date
7/16/2008 8:33:25 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2007044
IBM Index Class Name
PERMIT FILE
Doc Date
7/11/2008
Doc Name
Exhibit L thru V (volume 1)
From
Energy Fuels Resources Corp.
To
DRMS
Email Name
GRM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
116
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />• WHEEL LOADER LOAD AND CARRY WORK <br /> <br /> PROJECT IDENTIFICATION <br /> Task # : 02 yy State :Colorado PermiUjob # : M-2007-044 <br /> Date : 02/05/2008 County :Mesa Abbreviation :none <br /> User : GRM Sile :Whirlwind Mine Filename : M044-02w <br /> <br /> Agency or organization name :DBMS <br /> Permit or other job action : Initial Reclamation Liability Estimate <br /> Task description :replace 11 K cu/yds of ore in portal <br /> <br />_ . ,: _ <br />t: <br />- .: <br /> <br />:;. <br /> HOURLY EQUIPMENT COST Basic machine :CAT 938G (2003) Horsepower : 160 <br /> Attachment no. t :BOPS Cab Shift basis : 1 perday <br /> Data source : (CRG) <br /> Utilization °h <br /> Cost Breakdown : Ownership cost/hour : $16.13 NA <br /> Operating cosUhour : $26.21 100 <br /> Operator cosUhour : $32.78 NA <br /> Total unit costlhour : $75.11 Total fleet cosUhour : $75.11 <br /> ::, . , ,. <br />MATERIAL QUANTITIES <br /> Initial Swell Final <br /> volume : 11,000 LCY factor : NA volume : 11,000 LCY <br />• <br />. Source of quantity take-off :accepted estimate <br />Source of estimated swell factor : NA <br />HOURLY PRODUCTION (Cat HB) <br />Loader Cvcle Time Unadjusted basic cycle time (load, dump, maneuver) : 0.525 minutes <br />Cycle Time Factors Factor (min.) Source <br />Material : Mixed material 0.020 (Cat HB) <br />Stockpile : No adjustment - factor not applicable 0.000 (Cat HB) <br />Truck ownership : No adjustment - (actor not applicable 0.000 (Cat HB) <br />Operation : Constant operation -0.040 (Cat HB) <br />Dump target : Nominal target 0.000 (Cat HB) <br />Net cycle time adjustment : -0.020 minutes <br />Adjusted basic cycle time : 0.505 minutes <br /> <br />Rolling Resistance -Road Conditions <br />Haul :Rutted dirt, little maintenance, no water, 2" fire penetration <br />Return :Rutted diR, little maintenance, no water, 2"fire penetration <br />Haul and Return Time Length <br />{feet) Grade res. <br />(%) Rolling res. <br />(%) Total res. <br />(%) Travel time <br />(minutes) Data <br />Source <br />Haul route : 300 0.00 5.00 5.00 0.3066 (Cat HB) <br />Return route : 300 0.00 5.00 5.00 0.2770 (Cat HB) <br />Loader Bucket Capacity <br />Rated capacity <br />Bucket fill factor <br />Adjusted capacity <br />Total travel time : 0.5836 minutes <br />Total cycle lime : 1.089 minutes <br />3.25 LCY (heaped) (Cat HB) <br />0.825 Blasted rock -avg. blasted (75 - 90%) <br />2.6$ LCY <br /> Source <br />Job Condition Correction Factors Altitude adjustment factor : 1.00 (Cat HB) <br />Site altitude : 6,800 feet Job efficiency factor : 0.83 (1 shift/day) <br /> Net correction : 0.83 multiplier <br />Unadjusted hourly unit production : 147.78 LCY1Hr <br />Adjusted hourly unit production : 122.66 LCYlHr (Cat HBJ <br />Adjusted hourly fleet production : 122.66 LCYlHr <br />JOB TIME AND COST <br />Fleet size : 1 Loader(s) Total job time : 89.6$ Hours <br />Unit cost : $0.612 /LCY Total job cost : $6, 736 <br />
The URL can be used to link to this page
Your browser does not support the video tag.