Laserfiche WebLink
CIRCES Cost EstimatingSoftware <br />• DEMOLITION WORK <br />:.. ... <br />PROJECT IDENTIFICATION A en or or anization name DRfv1S <br />Task q : 01 w Stale :Colorado Permitlob# : M-2007-044 <br />Dale : 05-Feb-2008 County :Mesa Abbreviation :none <br />User : GRM Site :Whirlwind Mine Filename : M044-Ofw <br />Permitting action :Initial Reclamation Liability Estimate <br />Task description :demo of structures of Whirlwind portal <br />UNIT COSTS Last unit cost update : May, 2007 Location adjustment : 92.32% <br />• <br />• <br />STRUCTURE or ITEM DESCRIPTION DIMENSIONS DEMOLITION MENU SELECTION QUANTITY UNIT UNIT COST TOTAL COST <br />-water treatment sludge disposa! 40 cu/yds concrete slurry 40.00 cy $200.0000 $8,000.00 <br />chain link lancing 6' chain link fence Fencing, chain fink - to 6 R. H 1,100.00 LF $1.9200 $2,112.00 <br />-barbed wire fencing 3 strand along roads Fencing, barbed wire, - 3 strand 2,500.00 LF $1.0700 $2,675.00 _ <br />-water treatment liner drsposa/ 7000 sq /h haul /disposal 7,000.00 SF $0.7500 $5.250.00 <br />-shop building 40X50 Demo./disp./appr. dump - to 60 mi. 222.00 CF $1.1772 $261.34 <br />-shop slab 40X50X6' Demo./disp. exc. pit, 6" th.- 200 ff. 3,000.00 SF $1.7349 $5, 204.74 <br />~ <br />-used oil pad 8X10X4" Demo./dkp. exc. pit, 4" th.- 200 it. 80.00 SF $1.1586 $92.53 <br />-aux. stab 4 X 6 X 6" Demo./disp. exc. pit, 6'th.- 200 h. 24.00 SF $1.7349 $41.64 <br />-ore pad sump 6 X 6 X 8` Demo./dup. exc. pi(, 8" th.- 50 K. 36.00 SF $1.7164 561.79 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />JOB COST Subtotal (unadJusted): $2a,s99 Total Cost (adjusted for location}: $21,879 <br />