Laserfiche WebLink
t <br /> TASK 6 REVEGETATION <br /> All areas disturbed during reclamation work and any other areas specified in these Special <br /> Conditions will be revegetated according to the Revegetation Specifications in the General Bid <br /> Specifications. Commercial fertilizer is required for this project, and will be supplied by <br /> CONTRACTOR. Seed will be supplied by the OWNER. <br /> All areas disturbed during reclamation work and any other areas specified in these Special <br /> Conditions will be revegetated according to the Revegetation Specifications in the General Bid <br /> Specifications Section 20.0, except as modified by these Special Conditions. <br /> In addition to the revegetation specifications outlined in Section 20.0, General Bid <br /> Specifications, 1996, the following requirements will be adhered to: <br /> Seed <br /> Seed will be provided by the OWNER. CONTRACTOR must give the PROJECT MANAGER <br /> at least ten (10) working days notice of the acreage to be seeded, so that the proper amount <br /> of seed is delivered. Hand written acreage calculations are acceptable. <br /> Fertilizers <br /> Commercial fertilizer is required for this project. Fertilizer shall be provided by <br /> CONTRACTOR, and shall conform to Section 20.2 (commercial fertilizer) of the Revegetation <br /> Specifications, General Bid Specifications, 1996. <br /> Seedbed Preparation <br /> Seedbed preparation was accomplished as a result of Task 4, Surface Roughening. <br /> Mulches <br /> Mulching was accomplished during Task 4, Surface Roughening. <br /> CONTRACTOR will hand broadcast the seed and fertilizer in order to achieve an even distribution <br /> of each material over the roughened slope. Seed application rate is specified in the table <br /> contained in Section 20 of the revegetation Specifications, General Bid Specifications, 1996. <br /> Revegetation efforts will occur on approximately eight (8) acres, which includes the Work <br /> Area, the topsoil excavation area and the mine backfill area. <br /> Measurement and Payment <br /> Measurement and payment for this Task will be as per Revegetation Specification 20.0_ <br /> Revegetated areas will be measured to the nearest 0.1 acre and paid at the unit price bid on <br /> the Bid Schedule Item 6. The price bid shall include all costs for labor, materials, equipment <br /> and all other items necessary for revegetation as described in these specifications, including <br /> work at the Work area, topsoil excavation area and at the mine backfill area. Payment for this <br /> task will be made only for the unit price shown under Item 6 of the Bid Schedule. Payment <br /> shall be as this task is completed and approved by the PROJECT MANAGER. <br /> TASK 7 MINE OPENING BACKFILL <br /> An open abandoned mine entry is located about one half(1/2) mile west of the Work Area on the <br /> north side of the main road. The Dimensions of the opening are approximately eight feet (8') by <br /> ten feet (10') by twenty feet (20') in depth. The preferred closure method is backfill. Standard <br /> Work Specification 2.0 shall apply. The backfilled mine entry, and all areas disturbed as a result <br /> 9 <br />