i <br /> Site and material conditions are such that extremely dusty conditions may result from the <br /> excavation, hauling and deposition of topsoil materials. PROJECT MANAGER may require <br /> CONTRACTOR to implement dust control procedures throughout the Project Area for the <br /> duration of the Project. Such practices, such as applying water to work areas and roadways, <br /> are considered to be normal construction practices, and shall not result in additional expense <br /> to'OWNER. <br /> Measurement and Payment <br /> There will be no measurement for payment. Payment for this task will be reflected in a lump sum <br /> bid under Item 3 on the Bid Schedule. This lump sum bid will cover all costs for excavation and <br /> transportation of topsoil, distribution of topsoil at the Work Area and final grading and ripping of <br /> the topsoil excavation area. Additionally, payment shall include all costs necessary and incidental <br /> to dust control activities. Such payment shall be considered full compensation for all labor, <br /> materials, equipment and all other items necessary and .incidental to the excavation and <br /> placement of topsoil as directed and described in the specifications. Payment for this task will be <br /> made only for the amount bid under Item 3 of the Bid Schedule. Payment shall be as this task <br /> is completed and approved by the PROJECT MANAGER. <br /> TASK 4 SURFACE ROUGHENING <br /> Mulch Application <br /> After the topsoil is spread to a depth of eight inches (8") over the entire Work Area, two (2) <br /> tons of certified weed free mulch shall be applied to the soil surface. <br /> Mulch shall be provided by CONTRACTOR, and shall conform to Section 20.2 of the <br /> Revegetation Specifications, attached, except that all mulch shall be certified as noxious weed <br /> free or noxious weed seed free by any authorized State or County Officer. Documentation of <br /> certification shall be provided to the PROJECT MANAGER prior to application of mulch. <br /> The mulch shall be evenly distributed over the soil surface. Surface roughening will occur <br /> simultaneously with distribution of the weed free mulch in order to prevent loss of the mulch <br /> due to wind. <br /> Surface Roughening <br /> Severe surface roughening will follow topsoil distribution and mulch application. In order to <br /> accomplish the degree of severity of roughening required, the following will be accomplished <br /> by CONTRACTOR: <br /> Apply Topsoil; <br /> Apply two (2) tons per acre weed free mulch, simultaneously with slope <br /> scarification (below); <br /> - Scarify the surface by using a trackhoe bucket to gouge or pull the topsoil and <br /> mulch toward the machine in a manner such that no less than fifteen inches (15") <br /> of vertical relief is created. These gouges shall be sufficiently close so that no <br /> more than eighteen inches (18") exists between the crest of one gouge and the <br /> crest of an adjacent gouge, in any direction. <br /> Roughening in this manner will occur at all areas disturbed during reclamation construction, <br /> including the Work Area and the topsoil excavation area. Roughening of the channel footprint <br /> (Task 5, Channel Construction) need not be accomplished. <br /> 7 <br />