My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1999-09-02_GENERAL DOCUMENTS - C1981016 (2)
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981016
>
1999-09-02_GENERAL DOCUMENTS - C1981016 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/22/2021 11:28:09 AM
Creation date
7/15/2008 9:53:02 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981016
IBM Index Class Name
GENERAL DOCUMENTS
Doc Date
9/2/1999
Doc Name
PKA-0-451
Permit Index Doc Type
Reclamation Projects
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
122
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Topsoil Salvage <br /> Limited soil is present sporadically throughout the work area. Where present, topsoil will be <br /> salvaged and removed to an adjacent area. The area to stockpile salvaged topsoil will be jointly <br /> identified and agreed upon by PROJECT MANAGER and CONTRACTOR prior to initiating <br /> operations. A sediment retainment berT must be constructed around the topsoil when salvage <br /> operations are complete. The berm must be no less than twelve inches (12") in height, with <br /> 2H:1V side slopes. Alternatively, silt fence, complying with the specifications of Task 10, Post <br /> Construction Sediment Control, may bey installed. <br /> Surface Ripping <br /> The entire work area will be deeply ripped following topsoil salvage. Ripping shall occur parallel <br /> with the contour(perpendicular to the fall of the slope)throughout the area. Rippers shall be sunk <br /> a minimum of twelve inches (12") into the ground. Rip marks on the ground shall be spaced no <br /> less than twenty-four inches (24"), center to center. <br /> Trash Removal <br /> It is likely that metallic debris and miscellaneous trash will be uncovered during ripping operations. <br /> All trash and debris encountered or exposed during reclamation construction shall be removed <br /> from the site by CONTRACTOR, and properly disposed of in a licensed facility. Numerous roof <br /> bolts are in place along the perimeter of the mine area adjacent to the North Fork of the Gunnison <br /> River. These roof bolts and any rebar which also may be present will be collected and removed <br /> from the Project Area. Rebar is protruding from the top of a concrete retaining wall located <br /> adjacent to the railroad tracks. This rebar shall be cut flush with the top of the retaining wall. The <br /> cut rebar shall be removed from the Project Area. The trash and debris may be stockpiled on-site <br /> during performance of reclamation construction at a site jointly identified and agreed upon by <br /> PROJECT MANAGER and CONTRACTOR. <br /> Measurement and Payment <br /> There will be no measurement for payment. Payment for this task will be reflected in a lump sum <br /> bid under Item 2 on the Bid Schedule. This lump sum bid will cover all costs for site preparation <br /> activities required under this Task. Payment shall be as this task is completed and approved by <br /> the PROJECT MANAGER. Such payment shall be considered full compensation for all labor, <br /> materials, equipment and all other items necessary and incidental to the completion of Task 2, <br /> Surface Preparation. <br /> TASK 3 TOPSOIL APPLICATION <br /> I <br /> Topsoil shall be excavated from one or more areas located within the Project Area. The soil will <br /> be excavated and transported to the Wori Area, where it will be evenly distributed over the entire <br /> area. <br /> i <br /> Topsoil Excavation <br /> Topsoil shall be uniformly excavated from the identified borrow areas. Excavation shall proceed <br /> so that a berm is maintained between the excavation area and downslope areas, in order to <br /> prevent runoff from migrating off of thei excavation area. No excavated slope shall exceed <br /> 2.5H:1 V. Upon completion of excavation, the sides of the excavated area shall be contoured to <br /> naturally blend with adjacent, undisturbed areas. Upon completion of topsoil excavation activities, <br /> the excavated area will be ripped as described in Task 2, Surface Preparation. After ripping is <br /> completed, the excavation area shall be roughened and revegetated as per Tasks 4 and 6, <br /> respectively. <br /> Topsoil Application <br /> Topsoil shall be evenly distributed throughout the Work Area to a depth of eight inches (8"). In <br /> order to accomplish this, it is estimated that 6,450 cubic yards of topsoil will be excavated and <br /> applied to the Work Area. NOTE that topsoil will be applied to a different depth at the location of <br /> the channel to be built during performance of Task 6, Channel Construction. <br /> 6 <br /> . 1 <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.