My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2000-05-24_GENERAL DOCUMENTS - C1981037 (2)
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981037
>
2000-05-24_GENERAL DOCUMENTS - C1981037 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2021 8:51:47 PM
Creation date
7/14/2008 3:31:27 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981037
IBM Index Class Name
GENERAL DOCUMENTS
Doc Date
5/24/2000
Doc Name
PKA-0-457
Permit Index Doc Type
Reclamation Projects
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The Corley Company <br /> Phone 632-5050 P.O.Box 1821 <br /> COLORADO SPRINGS,COLORADO 80901 RECEIUED <br /> Nov. 18, 1994 NOV 2 1 1994 <br /> Mr. Jim McArdle <br /> Division of Minerals & Geology Division of ivlrnerals&Geology <br /> 1313 Sherman St. <br /> Denver CO 80203 <br /> Dear Mr. McArdle: <br /> The Corley Company would like to make the following formal complaints <br /> concerning the GEC East Pit work. <br /> 1 . The westerly slope of Chen' s Hill and the northerly slope of the hill <br /> between the East and West Pits are steeper than 3: 1 H:V. <br /> 2. There is almost no topsoil on the westerly slope of Chen' s Hill. <br /> 3. The drainage ditch along the road at the toe of Chen's. Hill has not <br /> functioned adecuately. This ditch has become completely filled with silt <br /> near the entrance gate with most of the water and sediment entering Energy <br /> Fuel's sediment pond. The silt deposition is sufficient to cover the first <br /> strand of barbed wire on the fence on the west side of the road. <br /> 4. The silt deposition on the road will probably close the road during next <br /> year's rains. <br /> S. The road has nearly been washed out near the East Pit because of <br /> inadequate provision for water to cross the road. <br /> _6. , The entrance gate .was damaged by the construction. machinery, -and we .-have-- <br /> asked the contractor to replace the gate. <br /> 7. The entrance gate post was removed by the contractor. He did not replace <br /> the post correctly, requiring that the post support be bent to connect to the <br /> post. The post needs to removed again and reset with the correct <br /> positioning. <br /> 8. The contractor' s dozer was parked for an extended time outside the gate. <br /> The dozer has leaked a considerable amount of oil that should be removed. <br /> 9. r:ost- of the concrete structures have not functioned. Most were not <br /> installed ccrrectly. <br /> Sincerely, <br /> W.D. Corley, <br /> President <br />
The URL can be used to link to this page
Your browser does not support the video tag.