Laserfiche WebLink
STATE OF COLORADO <br /> DIVISION Of MINERALS AND GEOLOGY of Coto <br /> Department of Natural Resources <br /> H o <br /> 1313 Sherman St., Room 215 t <br /> Denver,CO 80203 t'1876 <br /> Phone:(303)866-3567 <br /> FAX:(303)832-8106 Roy Romer <br /> Governor <br /> Michael B.Long <br /> Division Director <br /> MEMORANDUM <br /> DATE: November 16, 1993 <br /> TO: Dave Leavenworth, Purchasing Division <br /> q ' <br /> FROM: Maggie Van Cl f <br /> RE: GEC/East Pit Bond Coal Reclamation Project, Permit C-81-037 <br /> On October 21, 1993, the Mined Land Reclamation Board issued a Board Order that <br /> reclamation of the GEC East Pit be accomplished by the Inactive Mine Reclamation Project <br /> according to the attached schedule. <br /> In order to keep to the schedule the Board ordered, we anticipate using a Purchase Order <br /> contract. A reclamation plan and cost estimate have been prepared, using the Technical <br /> Information Processing System (TES). TIPS is supplied to DMG by the Department of the <br /> Interior; Office of Surface Mining and contains over 20 different state-of-the-art <br /> environmental engineering programs. The Reclamation Plan, preliminary maps and cost <br /> - estimate are attached: This Reclamation Plan will-be the basis for-the bid specifications. <br /> The cost estimate for this project is $345,870.00. We do not believe that the job could be <br /> bid in smaller sub-projects since Tasks 4 and 5, which must be included in one job due to the <br /> planned movement of dirt, have a total estimated cost of $172,701.00. <br /> On past jobs of this size and cost bid by the Division, you have expressed a desire to review <br /> the specifications to see that they are adequate. Since we have a tight schedule to keep in <br /> order to comply with the Mined Land Reclamation Board Order, please let me know the <br /> following: <br /> 1) If you wish to review the specifications; <br /> 2) When in the bid process you would like to review the specifications; and, <br /> 3) The time I should allow in the schedule for your review. <br /> I will call you later this week to discuss this project. <br />