Laserfiche WebLink
Pioneer Canyon-AML Project involved drilling and Investigation of an active coal fire located in the South Field <br /> area of the Canon City Coal field,Fremont County. The Project included drilling exploratory holes to determine <br /> subsurface overburden and mine conditions, identify extent and direction of movement of the fire,and develop data <br /> and an understanding of the fire so that a containment or extinguishment approach could be designed for Phase I1. <br /> Temperature monitoring instruments were also installed to monitor fire behavior and evaluate future planned <br /> remediation efforts. Construction dates 6\14\93 to 8/5/93. Final Cost$32,872.00 <br /> 8-5-93-Dr. Corley gave consent to perform backfilling tasks on July 23 and rescinded that consent on July 26, <br /> requesting that all work be suspended and the DMG leave the property. The contract was thus concluded <br /> before it was completed and the contractor released. Complete reclamation of the haul roads and access <br /> pathways was not completed nor were all of the subsidence craters filled and sealed. <br /> "May 8,2000"memo outlining problems with Dr. Corley and the August 16, 1993 letter to Frank Johnson,AG's <br /> office. 8-25-26, 1993 Board meeting and also the October 21, 1993 Board Meeting. (Note-the computer <br /> put a current date on this document. Original is probably in the file with an earlier date.) <br /> GEC Maintenance-Severance Tax Project-C-81-037 The Project work would consist of a relocation of a private <br /> road that crosses the previously reclaimed GEC open pit coal mine,reclamation of a severe erosional feature and <br /> revegetation. Low Bidder was Tezak Heavy Equipment Co for$40,200,next low bidder was Dave's Enterprises <br /> for$44,870 and the third low bidder was Kessler Reclamation for$45,022.50 <br />