My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
_GENERAL DOCUMENTS - C1981037 (3)
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981037
>
_GENERAL DOCUMENTS - C1981037 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2020 2:45:19 PM
Creation date
7/14/2008 3:28:39 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981037
IBM Index Class Name
GENERAL DOCUMENTS
Doc Name
PKA-0-457
Permit Index Doc Type
Reclamation Projects
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Pioneer Canyon-AML Project involved drilling and Investigation of an active coal fire located in the South Field <br /> area of the Canon City Coal field,Fremont County. The Project included drilling exploratory holes to determine <br /> subsurface overburden and mine conditions, identify extent and direction of movement of the fire,and develop data <br /> and an understanding of the fire so that a containment or extinguishment approach could be designed for Phase I1. <br /> Temperature monitoring instruments were also installed to monitor fire behavior and evaluate future planned <br /> remediation efforts. Construction dates 6\14\93 to 8/5/93. Final Cost$32,872.00 <br /> 8-5-93-Dr. Corley gave consent to perform backfilling tasks on July 23 and rescinded that consent on July 26, <br /> requesting that all work be suspended and the DMG leave the property. The contract was thus concluded <br /> before it was completed and the contractor released. Complete reclamation of the haul roads and access <br /> pathways was not completed nor were all of the subsidence craters filled and sealed. <br /> "May 8,2000"memo outlining problems with Dr. Corley and the August 16, 1993 letter to Frank Johnson,AG's <br /> office. 8-25-26, 1993 Board meeting and also the October 21, 1993 Board Meeting. (Note-the computer <br /> put a current date on this document. Original is probably in the file with an earlier date.) <br /> GEC Maintenance-Severance Tax Project-C-81-037 The Project work would consist of a relocation of a private <br /> road that crosses the previously reclaimed GEC open pit coal mine,reclamation of a severe erosional feature and <br /> revegetation. Low Bidder was Tezak Heavy Equipment Co for$40,200,next low bidder was Dave's Enterprises <br /> for$44,870 and the third low bidder was Kessler Reclamation for$45,022.50 <br />
The URL can be used to link to this page
Your browser does not support the video tag.