Laserfiche WebLink
PROJECT WORK DESCRIPTION <br /> The following tasks will be performed on this Project: <br /> Task #1: Mobilization and Demobilization <br /> Task #2: Linden Avenue Loadout coal removal and reclamation <br /> Task #3: Section 15 stream realignment <br /> Task #4: Pond 15-P10 removal <br /> Task #5: Reconstruction of Pond 22-P10 <br /> Task #6: Ditch repair, culvert installation, rock swale construction <br /> Task #7: Spillway repair and clean out of Pond 15-P20, and removal of associated ditch <br /> Task #8: Spillway removal pond 22-P4 <br /> Task #9: Ditch and gully repair <br /> Task #10: Spillway repair ponds 15-Pll and 15-P12 <br /> Task #11: Riser modification, Ponds 22-P5, 22-P6, and 22-P10 <br /> Task #12: Trailer removal <br /> Task #13: Revegetation <br /> Task #14: Non-guaranteed task - reforestation of areas near Ponds 15-P20 and 22-P17 <br /> Task #15: Non-guaranteed task - Pond 15-P1 clean-out <br /> 6 <br /> �I I <br />