Laserfiche WebLink
STATE OF COLORADO <br /> DIVISION OF MINERALS AND GEOLOGY <br /> Department of Natural Resources <br /> 1313 Sherman St.,Room 215 <br /> Denver,Colorado 80203 <br /> Phone:(303)866-3567 <br /> FAX:(:303)832-8106 <br /> DEPARTMENT OF <br /> DATE: March 23, 1995 <br /> NATURAL <br /> RESOURCES <br /> TO: All Bidders on the Trinidad Basin Mining Project <br /> Roy Romer <br /> Governor <br /> FROM: John Nelson, Project Manager James S.Lochhead <br /> Executive Director <br /> SUBJECT: Amendment Number 1 to MVC-MINES-348 Michael B.Long <br /> Division Director <br /> Thank you for attending the Pre-bid Meeting on March 17, 1995. The following amendments <br /> and clarifications should be incorporated into the Bid and Special Conditions: <br /> Bid Submittal <br /> 1. Enclosed is the yellow bid envelope which must be used when submitting your bid to the <br /> Division of Minerals and Geology at 1313 Sherman Street, Room 215, Denver, Colorado <br /> 80203. If you use a manilla envelope, tape the yellow envelope to the manilla envelope. <br /> 2. Enclosed is a revised bid schedule which replaces the bid schedule in your bid document. <br /> This revised bid schedule must be submitted as part of the bid package <br /> SPECIAL CONDITIONS <br /> The Special Conditions of this bid document are modified and or clarified to the extent outlined <br /> below. All conditions not specifically referenced below shall remain unchanged as worded in the <br /> original bid document. <br /> 1 . TIME OF COMPLETION. The time of completion allowed for the project has been changed <br /> to 40 days after receipt of the Notice to Proceed. This includes ten (10) days mobilization <br /> time. <br /> 2. TASK 2-LINDEN AVENUE COAL LOADOUT. This task has been significantly modified. The <br /> primary objective of Task 2 is to evenly grade the loadout so that drainage is away from the <br /> railroad tracks, and revegetate disturbed non-coal areas parallel to the Baca ditch. After final <br /> grade has been achieved, a portion of the coal and coal fines will remain on the loadout site <br /> as the final graded surface. Coal fines and other imported rock (spoil) will be removed to a <br /> depth sufficient to create a 1 percent grade away from the base of the railroad ties toward <br /> the Baca Ditch for a distance of 50 feet ending in a shallow drainage swale parallel to the <br /> tracks and the Baca Ditch (See Cross Section 1). This grading will extend along the railroad <br /> tracks for a distance of 950 feet. Spoil resulting from this grading operation will be disposed <br /> of on the loadout area.starting on the east side of the drainage swale and extending toward <br /> but not up to the Baca Ditch. Coal spoil will be placed on portions of the loadout currently <br /> 1 <br />