Laserfiche WebLink
Task 10 - Spillway Repair <br />Work Description <br />The emergency spillways of Ponds 15-P1 1 and 15-P12 shall be lowered one and one-half <br />0 1/2) feet to accommodate a total of 3 feet of riprap. Riprap material must consist of <br />durable irregular rock having a minimum D-50 of 6 inches and a D-max of 9 inches. Riprap <br />will have to be imported (see Drawing #3). <br />Measurement and Payment <br />There will be no measurement for Task #10. Payment for Task #10 will be reflected under <br />Item #10 on the Bid Schedule. <br />Task 11 - Riser Modification <br />Work Description <br />Risers on the primary spillways of ponds 22-P5, 22-P6 and 22-P10 shall be cut so that twelve <br />inches of vertical pipe remains. <br />Measurement and Payment <br />There will be no measurement for Task #11. Payment for Task #11 will be reflected under <br />Item #11 on the Bid Schedule. <br />Task 12 - Trailer Removal <br />Work Description <br />The white, 40-foot house trailer and all trash associated with the trailer site located in the <br />south central portion of Section 15 shall be removed and disposed of in an approved landfill. <br />Measurement and Payment <br />There will be no measurement for Task #12. Payment for Task #12 will be reflected under <br />Item #12 on the Bid Schedule. <br />10