My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1995-04-13_GENERAL DOCUMENTS - C1981048
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981048
>
1995-04-13_GENERAL DOCUMENTS - C1981048
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/8/2021 7:49:59 PM
Creation date
7/11/2008 2:20:13 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981048
IBM Index Class Name
GENERAL DOCUMENTS
Doc Date
4/13/1995
Doc Name
PKA-9-440
Permit Index Doc Type
Reclamation Projects
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Task 5 - Reconstruction of Pond 22-P10 <br />The purpose of this task is to construct a new northwest embankment for Pond 22-P10, <br />repair damage to the adjacent haulage road, and install a new culvert under the road. <br />Work Description <br />A new northwest embankment shall be constructed between the haul road and a prominent <br />siltstone outcrop on the southwest side of the existing Pond. It will be approximately five feet <br />high by 60 feet in length, with an 8-foot crest width. Some material for its construction is <br />available from the Pond, however care must be taken not to damage willows which have <br />become established within the Pond. The majority of construction material will have to be <br />imported, possibly from the Pond 15-P10 or stream realignment areas. Gullies cutting into <br />the road northwest of the pond shall be filled and the road regraded. The existing culvert at <br />Pond 22-P10 will be supplemented with a 36-inch CPS culvert. It shall be installed adjacent <br />to and at the same grade as the existing culvert. Estimated length is 50 feet. <br />Measurement and Payment <br />There will be no measurement for Task #5. Payment for Task #5 will be reflected in a lump <br />sum bid under Item 5 on the Bid Schedule. <br />Task 6 - Ditch Repair, Culvert Installation, and Rock Swale Construction. <br />Work Description <br />Two hundred seventy-five (275) feet of ditch, from the south edge of pond 22-P10 to a point <br />approximately halfway between the Pond and Culvert C-10 will be widened, shaped and <br />riprapped as shown in Drawing #2. At this point an 8 ft. x 2 ft. berm will be installed across <br />the ditch and a 30-inch CSP culvert under the road. The culvert will be approximately 50 feet <br />in length. <br />At culvert C-3, approximately 800 feet southeast of Pond 22-P10, a 20-foot wide x 2 ft deep <br />rock swale will be constructed across the road. <br />Measurement and Payment <br />There will be no measurement for Task #6. Payment for Task #6 will be reflected in a lump <br />sum bid under Item #6 on the Bid Schedule. <br />8
The URL can be used to link to this page
Your browser does not support the video tag.