My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1995-03-17_GENERAL DOCUMENTS - C1981048 (4)
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981048
>
1995-03-17_GENERAL DOCUMENTS - C1981048 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/8/2021 4:06:17 PM
Creation date
7/11/2008 2:14:30 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981048
IBM Index Class Name
General Documents
Doc Date
3/17/1995
Doc Name
PKA-9-440
Permit Index Doc Type
Reclamation Projects
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br /> Demobilization <br /> Upon completion of the work under this Contract, the CONTRACTOR shall remove all <br /> temporary works, equipment and construction plant. The CONTRACTOR shall remove from <br /> the work site all rubbish, unused materials, and shall fill and dress all holes and cavities made <br /> for convenience, and leave all areas in good order and condition, subject to the approval of <br /> the PROJECT MANAGER. <br /> 1.3 MEASUREMENT AND PAYMENT <br /> No measurement for payment shall be made for mobilization and demobilization. Payment of <br /> two-thirds of the lump sum price bid will be made with the first monthly progress payment <br /> after completion of the work described above for mobilization. Payment of one-third of the <br /> lump-sum price bid will be made with the final progress payment for the work if demobilization <br /> has been completed. If the price bid for mobilization and demobilization is greater than 15 <br /> percent (15%) of the total contract price, invoices supporting the mobilization costs will be <br /> required before payment is approved. <br /> Remobilization <br /> If remobilization becomes necessary due to seasonal conditions beyond the CONTRACTOR'S <br /> control, remobilization costs will be paid based on documented actual costs. No <br /> remobilization payment will be made if delays necessitating remobilization were the <br /> CONTRACTOR'S responsibility. <br /> 15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.