Laserfiche WebLink
is chosen, hydromulch will be applied at the rate of 1 1/2 tons per acre. Mulch will be <br /> crimped (stabilized or anchored) into the soil by hand with a suitable tool on 18" centers. <br /> The cost for revegetation will be based on lump sum. The area to be revegetated is <br /> estimated to total 1.5 acres not to exceed 2.0 acres. <br /> Project work is expected to be performed between May through the 24, 1996. Please refer <br /> to the site map and bid schedule below. This sheet must be returned to: <br /> 946 B 172 o d, Grand unc ' , <br /> - Maggie VanCleeP, M3) 832-8106 <br /> 3i35 ` <br /> Any questions regarding the work may be directed to Paul Krabacher at (303) 248-7253. <br /> La Plata No. 1 Mine Maintenance Project <br /> Bid Schedule <br /> Description Unit Unit Rate Total <br /> Hydraulic excavator, 25' min IWHours $ /hr. $ <br /> reach, 30" min bucket w/ <br /> operator <br /> Revegetation including seeding, Lump Sum N/A $ <br /> mulching, crimping <br /> Grand Total $ <br /> Contractor Date <br /> Signature Phone <br /> Address <br /> Tax ID # <br /> THIS BID SCHEDULE MUST BE RETURNED WITH YOUR BID <br /> Page 1 of 1 Page <br />