Laserfiche WebLink
3. Automobile Liability (Minimum). The contractor must carry a minimum of $600,000 <br /> combined single limit. <br /> Work Description <br /> Hourly bids are being solicited for work to be performed at the Peacock Mine site in Hay Gulch <br /> southwest of Durango, Colorado. Machine work will involve the recontouring of access roads <br /> to the portal area. The portal area has previously been reclaimed but the roads will be pulled <br /> back to approximate original contour. All recontoured or otherwise impacted areas will be <br /> revegetated as described below. <br /> All equipment rental hours will be conducted per the attached 19.0 Equipment Rental <br /> specifications. The Project Manager must be on site for all equipment rental hours. The <br /> Project Manager will be available during regular business hours (8:00 A.M. to 5:00 P.M.) on <br /> weekdays. Equipment Rental time will not be scheduled on weekend days or holidays without <br /> prior approval of the Project Manager. <br /> 1) Hydraulic Excavator Hours - Bids are being solicited for an excavator with a minimum <br /> 25' reach and a minimum 30"1 bucket with operator. Mobilization will be included in <br /> the submitted hourly rate. Work will consist of the pulling back of approximately 1400 <br /> linear feet of approximate 20' wide road. Recontouring will be to approximate original <br /> contour involving the placement of downslope material and the blending in of the upper <br /> slope cut. Payment for all machine work will be based to the nearest 1/2 hour per <br /> 19.0 Equipment Rental specifications. 40 hours are estimated to be the time required <br /> to complete the site work. This is an estimate only. The total 40 hours are NOT <br /> guaranteed. <br /> 2) Revegetation - After recontouring delineated access roads, all disturbed areas will be <br /> reseeded with seed provided by the State. Seed will be sown uniformly on the <br /> prepared areas. Broadcast seed will be covered about 1/4 to 1/2 inch deep by a <br /> method acceptable to the Project Manager. All reseeded areas will be mulched with <br /> hay or straw mulch and certified to be pest and weed-free. Mulch will be supplied by <br /> the Contractor. Approximately 30 percent by weight of the mulch material will be 10 <br /> inches in length or longer. Hay or straw mulch will be applied uniformly at the rate of <br /> two tons per acre. If hydromulching is chosen, hydromulch will be applied at the rate <br /> of 1 1/2 tons per acre. Mulch will be crimped (stabilized or anchored) into the soil by <br /> hand with a suitable tool on 18" centers. The cost for revegetation will be based on <br /> lump sum. The area to be revegetated is estimated to total 1 .5 acres not to exceed <br /> 2.0 acres. <br /> Project work is expected to be performed between May 20 through the 24, 1996. Please <br /> refer to the attached site map and bid schedule. <br /> 2 <br /> i <br />