My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-07-03_INSPECTION - M1993004
DRMS
>
Day Forward
>
Inspection
>
Minerals
>
M1993004
>
2008-07-03_INSPECTION - M1993004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:34:06 PM
Creation date
7/3/2008 1:53:26 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1993004
IBM Index Class Name
Inspection
Doc Date
7/3/2008
Doc Name
Insp Rpt
From
DRMS
To
Robinson Brick
Inspection Date
6/9/2008
Email Name
JLE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Agency or organization name : DRMS <br />Permit or other job action : SO <br />Task description :-Creating 3.1 <br />around pit <br />....... <br />HOURLY EQUIPMENT COST <br />Basic machine : Cat D8R Series ll - 8SU (20011 Horsepower : 310 <br />Blade type : Semi-Universal <br />Attachment no. 1 :ROPS Cab Shift basis : 1 per day <br />Attachment no. 2:3-shank ripper <br />volume : 42,950 LCY factor : NA volume : 42,950 LCY <br />Source of estimated volume: Inspection <br />Source of estimated swell factor :NA <br />:.: <br />HOURLY PRODUCTION <br /> <br />Job Condition Correction Factors <br /> <br />Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 90 feet Material consistency (Cat HB) <br />Unadjusted hourly production : 918.4 LCY/hr Dozing method (slot) <br /> <br />M Visibility (avg.) <br />aterial consistency description Job efficiency : 8 <br />3 (lshiff/day) <br />Dry, non-cohesive <br />Spoil pile : M <br />(Md <br />i) <br /> -r <br /> Push gradient : (Cat HB) <br />Average push gradient: 6.00 % (neg) Altitude 0 (Cat HB) <br />Average site altitude 6,000 feet Material weight: (Cat HB) <br /> Blade type (S/SU/U) <br />Material weight :_ 2,100 Ibs/LCY Net correction : 0.60 <br />Weight description <br />Earth - Loam <br />JOB TIME AND COST <br />Fleet size : 1 Dozer(s) <br />Adjusted unit production : 54701 LCY/hr <br />Adjusted fleet production : 547.01 LCY/hr <br />Total job time : 78.52 Hours <br />Unit cost : $0.271 /LCY Total job cost : $11,654
The URL can be used to link to this page
Your browser does not support the video tag.