Laserfiche WebLink
CIRCES Cost Estimatinla Software <br />SCRAPER . nNt v wnov <br />PROJECT IDENTIFICATION <br />Agency or organization name : DRMS <br />Task #: 001 State : Co%rado <br />Date : 06x2712008 County : Elbert <br />User : JLE Site : Navapo <br />Permit or other job action : SO <br />Task description :4c- <br />HOURLY EQUIPMENT COST <br />Permit/job #: M-1993-004 <br />Abbreviation : none <br />Filename : 4004-001 <br />from stocking area to pit <br />Model : Cat 623G Shift basis : 1 per day <br />Cost Breakdown : Job utilization % Horsepower : 365 <br />Ownership cost/hour : $75.32 NA Weight (UST) : 40 <br />92 <br />Operating cost/hour : $77.28 75 . <br />Cost data source : (CRG) <br />Operator cost/hour : $24.95 NA <br />Total unit cost/hour : $177.54 Total fleet c ost/hour : $355.08 <br />M ::; :..... ... ........ ... <br /> <br />TIES ................. ..................................... .. .. .. <br />............ <br />....... ... . <br />Initial Swell Loose <br />volume : 2,633 BCY factor : 1.230 volume : 3,239 LCY <br />Material Weight : 2,500 pounds/LCY <br />Material <br />description : Struck volume : 18.00 LCY <br />Clay - <br />Dry Heaped volume : 23.00 LCY <br />Rated payload : 55,000 pounds Average volume: 20.50 LCY <br />Payload capacity: 22.00 LCY Adjusted capacity: 20.50 LCY '•• <br />Cycle Time (load + haul + spread + return): Loading time : 0 <br />90 ' <br /> . minutes <br /> <br />Travel Ume : Maneuver and spreading time : -a 7o minutes <br /> • loading time per pair on push-pull models <br />Route Distance (feet) Grade (%) Roll. res.(e,G) Total res.(%) Velocity (fpm) Travel time (min <br />) <br />Haul : 600 3.0 4.0 <br />Return : 600 7.0 944 a69 . <br />minutes •' <br />-3.0 4.0 <br />•• travel Ume adiusted for acceleration and deceleration at load and du <br />mp pants 1.0 2, 710 <br />0.22 <br />minutes " <br />velocities are max. attainable per total resistance shown, not average Total cycle time <br />2.51 <br />minutes <br />Job Condition Correctlon Factory <br />Site altitude (feet) : 6,000 Adiusted Hourly Production <br />Altitude adjustment factor : 1.00 (Cat HB) Unadjusted unit production : 489.99 LCY/Hour"• <br />Job efficiency factor : 0.83 (1 shilfYday) Adjusted unit production : 406.69 LCY/Hour <br /> Adjusted fleet production : 813.39 LCY/Hour <br />Net job correction factor 0.83 •? 2 times volume on push-pull ,,,oriels <br />JOB TIME AND COST <br />Fleet size : 2 Scraper(s) Total job time : 3.98 Hours <br />Unit cost : $0.437 /LCY Total job cost : $1,414