Laserfiche WebLink
CIRCES Cost Estimatina Software <br />PROJECT IDENTIFICATION <br />Task #: 002 <br />Date : 0612412008 <br />User : BMK <br />State : Colorado <br />County : Pueblo <br />Site : Pope Pit # 2 <br />Permitljob# M--1986-101 <br />Abbreviation :none <br />Filename :M101-002 <br />Agency or organization name: DRMS <br />Permit or other job action : SO FROM POPE TO POPE INC <br />Task description :APPLY 3 INCHES OF TOP SOIL OVER 9.2 ACRES <br />:::: <br />HOURLY EQUIP;:.;:.;:.:.... <br />MENT,;. <br />COST <br />Basic machine : Cat D8R Series ll - 8SU (200: Horsepower : 310 <br />Blade type :Semi-Universal <br />Attachment no. 1 : ROPS Cab Shift basis : 1 per day <br />Attachment no. 2: 1-shank ripper <br /> Data source : (CRG) <br /> Utilization % <br />Cost Breakdown : Ownership cost/hour : $58.03 NA <br /> Operating cost/hour : $77.13 100 <br /> Ripper op. cost/hour : <br />- $3.40 <br />- 40 <br /> Operator cost/hour: -i32.78 NA <br /> Total unit cost/hour : $171.34 Total fleet cost/hour : $171:34 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 3,710 BCY factor : 1.430 volume : 5,305 LCY <br /> <br />Source of estimated volume : EXHIBIT E <br />Source of estimated swell factor : EXHIBIT E <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 250 feet Material consistency : 0.90 (Cat HB) <br />Unadjusted hourly production : 377.8 LCY/hr Dozing method : 1.20 (slot) <br /> Visibility: 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (lshift/day) <br />Compacted fill or embankment Spoil pile : 0.80 (fnd-nq <br /> Push gradient : 1.02 (Cat HB) <br />Average push gradient : 1.00 % (neg) Altitude 1.00 (Cat HB) <br />Average site altitude : 6,700 feet Material weight : 0.70 (Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 3,300 Ibs/LCY Net correction : 0.38 <br />Weight description : <br />Decomposed rock - 75% Rock, 25% Earth <br />Adjusted unit production : 144.79 LCY/hr <br />Adjusted fleet production : 144.79 LCY/hr <br />JOB TIME AND COST <br />Fleet size : 1 Dozer(s) Total job time : 36.64 Hours <br />Unit cost : $1.183 /LCY Total job cost : $6,278