Laserfiche WebLink
Agency or organization name : DRMS <br />Permit or other job action : SO FROM POPE TO POPE INC <br />Task description : RIP AND GARDE 9.2 ACRES <br />HOURLY :EQUIPMENT ... . ........ ...................................................................................................................................................................... <br />..................... <br />COST <br />Basic machine : Cat D8R Series II - 8SU (200; Horsepower : 310 <br />Blade type : Semi-Universal <br />Attachment no. 1 : ROPS Cab Shift basis : i per day <br />Attachment no. 2: I-shank ripper <br /> Data source : (CRG) <br /> Utilization % <br />Cost Breakdown : Ownership cost/hour : $58.03 NA <br />Operating cost/hour : $77.13 100 <br />Ripper op. cost/hour : $3.40 40 <br />Operator cost/hour : $32.78 NA <br />Total unit cost/hour : $171.34 Total fleet cost/hour : $171.34 <br />MATERIAL :::::::............................................................................................ <br /> <br />QUANTITIES.. .......................... <br />............................ <br />........................................................................ <br />.......................... <br />........................... <br />Initial Swell Loose <br />volume : 7,421 BCY factor : 1.430 volume : 10,612 LCY <br />Source of estimated volume : EXHIBIT E <br />Source of estimated swell factor : EXHIBIT E <br /> <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br />Average push distance : 250 feet <br />Unadjusted hourly production : 377.8 LCY/hr <br />Material consistency description <br />Compacted rill or embankment <br />Average push gradient : 1.00 % (I <br />Average site altitude : 6,700 feet <br />Material weight : 3,300 Ibs/LCY <br />Weight description : <br />Decomposed rock - 75% Rock, 25% Earth <br />JOB TIME AND COST <br />Fleet size : 1 Dozer(s) <br />Operator skill : 0.75 (avg.) <br />Material consistency : 0.90 (Cat HBI <br />Dozing method : 1.20 (slot) <br />Visibility: 1.00 (avg.) <br />Job efficiency : 0.83 (1shift1daj <br />Spoil pile : 0.80 (fnd-ro <br />Push gradient : 1.02 (Cat HB) <br />Altitude : 1.00 (Cat HB) <br />Material weight : 0.70 (Cat HB) <br />Blade type : 1.00 (S/SU/U) <br />Net correction : 0.38 <br />Adjusted unit production : 144.79 LCY/hr <br />Adjusted fleet production : 144.79 LCY/hr <br />Total job time : 73.29 Hours <br />Unit cost : $1.183 /LCY Total job cost : $12,558