0 The amount of topsoil proposed to be disturbed is 5,624 C.Y. as shown in Table C-1. Because <br />• <br />• <br />12,775 C.Y. must to be replaced, 7,151 C.Y. of soil will need to be harvested from the existing <br />topsoil pile. If the topsoil salvage depth deviates from the expected 3-6 inches, the amount of <br />topsoil left in the pile will vary. <br />3. Haul Roads and Access <br />The access road will head north directly from Highway 90 using an existing road access point. <br />This access road will not be reclaimed at the end of mining to allow access through the site. <br />4. Reclamation Timetable <br />The timetable for reclamation is shown below in Table D-2. Reclamation Timetable <br />Table D-2 Reclamation Timetable <br /> Length of time to <br />Year Phase Comments <br /> com lete months <br />2008 Site Preperation, Topsoil stripping, install 2 <br /> 1 Stormwater Containment Berm 1. <br />2008- Mine in Mining Area 1, stockpile topsoil, seed <br /> <br />2013 <br />2 <br />topsoil stockpile. 58.2 <br />2013- Mine in Mining Area 2, place overburden and <br /> topsoil on sideslopes and pit floor in Mining Area 39.5 <br />2017 3 1, seed <br /> Replace topsoil in all remaining unreclaimed areas. <br /> Install Stormwater Containment Berm 2, <br />2017 Seed/Reseed all areas that don't have adiquete 2 <br /> 4 vegetation. <br /> Total 101.7 <br />Pinion Ridge Pit, June 2008 D-2