Laserfiche WebLink
<br />Area Description continued Acreage <br />5. Topsoil Stockpile #7 3.20 <br />6. Topsoil Stockpile #8 1.90 <br />7. Sediment Pond #1 2.90 <br />8. Sediment Pond #2 0.64 <br />9. Haul Road to North Pit 2.31 <br />10. Main Access road into Site 1.38 <br />12. South Pit Drill Pad 2.00 <br />12. Equipment Area 1.58 <br />Total Disturbed Area 37.61 <br />Undisturbed Area 156.08 <br /> <br />Total Permit Area 193.69 <br />Feature acreages are based on those reported on Map 5-3 (Goff Engineering, January 28, 1998) and <br />the Surface Water Control Map (Goff Engineering, February 10, 1998), and acreages reported in <br />the 2005 Annual Reclamation Report based on information in surety release SIr02. <br />2.05.3 Operation Plan -Permit Area <br />2.05.3(2) Operation Description <br />No further coal mining is proposed. The operations remaining are those described above related to <br />reclamation and monitoring at the mine. <br />2.05.3(31 Mine Facilities <br />No mine facilities will remain after completion of reclamation with the exception of the paved haul <br />road that serves the Ewing Mesa # 1 Pit and has been approved for permanent retention. Sediment <br />control structures will be removed after a demonstration of erosion minimisation attainment as <br />provided for in the CDMG liability and bond release criteria. The following information is retained <br />for historical documentation and perspective and to demonstrate regulatory compliance where <br />applicable. <br />• TR09, TRIl, TR12, TR13 5-2 Revised 3/98, S/02, 9/03, <br />03106 <br />