Laserfiche WebLink
s <br />SEDIMENT CONTROL DESIGN <br />CARBON JUNCTION NINE <br />OARRIDGE ENERGY, INC. <br />• <br />NAME OF STRUCTURE: Culvert by T.H.2 <br />TYPE OF STRUCTURE: Culvert <br />LOCATION: North of Topsoil Pile 2 <br />STORM TYPE: 10 yr.24 hr. event <br />BABZC DATA <br />1. PRECIPITATION EVENT: <br />2. WEIGHTED SOILS COMPLEX NO: <br />3. LENGTH: <br />4. AREA: <br />5. SLOPE: <br />6. HYDRAULIC LENGTH: <br />7. RUNOFF: <br />8. TIME CONCENTRATION, HOUR <br />9. PEAK DISCHARGE PER UNIT: <br />10. TOTAL PEAK DISCHARGE: <br />STRUCTURE DESIGN <br />2.25 in. <br />87 <br />300 ft. <br />.0022 sgmi <br />13$ <br />300 ft. <br />1.10 in. <br />.07 <br />1000 cfs/in/sgmi <br />2.4 cfs <br />1. LENGTH: 40 ft. <br />2. WIDTH: 18"dia. <br />3. HEIGHT: n/a <br />4. FLOW DEPTH AT PEAK DISCHARGE: n/a <br />5. SAFETY FACTOR, BOTTOM: n/a <br />6. SAFETY FACTOR, SIDES: n/a <br />7. WALL SLOPE: n/a <br />8. VELOCITY: 1.35 fps <br />• <br />