Laserfiche WebLink
<br />• <br />NAME OF BTRUCTURE: <br />TYPE OF BTRUCTURE: <br />LOCATION: North of <br />STORM TYPE: 10 yr. <br />HABIC DATA <br />SEDIMENT CONTROL DESIGN <br />CARBON JUNCTION MINE <br />OARRIDGE ENERGY, INC. <br />Haul road culverts <br />Culverts <br />Sediment Pond No. 1 under haul road. <br />24 hr. event. <br />1. PRECIPITATION EVENT: <br />2. WEIGHTED SOILS COMPLEX N0: <br />3. LENGTH: <br />4. AREA: <br />5. SLOPE: <br />6. HYDRAULIC LENGTH: <br />7. RUNOFF: <br />8. TIME CONCENTRATION, HOUR <br />9. PEAK DISCHARGE PER UNIT: <br />10. TOTAL PEAK DISCHARGE: <br />STRUCTURE DESIGN <br />1. LENGTH: <br />2. WIDTH: <br />3. HEIGHT: <br />4. FLOW DEPTH AT <br />5. SAFETY FACTOR, <br />6. SAFETY FACTOR, <br />7. WALL SLOPE: <br />8. VELOCITY: <br />PEAK DISCHARGE: <br />BOTTOM: <br />SIDES: <br />2.25 in. <br />90 <br />4o ft. <br />0.037 sgmi. <br />1.0~ <br />40 ft. <br />1.31 <br />.18 <br />820 cfs/in/sgmi. <br />39.75 cfs. <br />40 ft. <br />2-24" dia. <br />n/a <br />n/a <br />n/a <br />n/a <br />n/a <br />6.33 fps. <br />DESIGN: Two 24" culverts have been installed. <br /> <br />