Laserfiche WebLink
3.0 RESULTS <br />USLE CALCULATIONS <br />Based on our derived and calculated factor values, the following comparison using the <br />USLE can be made. <br />Location R K LS C P A (T/ac/yr) <br />North Pit per reclaimed 40 0.28 14.00 0.06 1 9.41 <br />North Pit (Lower reclaimed 40 0.28 21.2 0.06 1 14.24 <br />North Pit (Native) 40 0.25 28.18 0.13 1 36.63 <br /> <br />Haul Road reclaimed 40 0.28 3.37 0.06 1 2.26 <br />Haul Road (Native) 40 0.25 11.55 0.13 1 15.05 <br /> <br />Equipment Area reclaimed 40 0.28 0.85 0.06 1 0.57 <br />Equipment Area (Native) 40 0.28 0.57 0.31 1 1.97 <br />Oakridge Energy Carbon Junction Mine Page 6 <br />Sediment Pond Sedimentology Demonstration