<br />MINED LAND RECLAMATION BOARD 110(2) ANNUAL REPORT <br />For Season 2007 <br />COLORADO CALUMET COMPANY INCORPORATED <br />PERMIT NO. M-2006-034 <br />Summary: <br />Prepared: 15 April 2008 <br />Colorado Calumet Company Inc. operated mechanized equipment on the Blue Streak No. <br />2 mining claim from 6 July through 21 July 2007 in Teller County, Colorado to produce <br />amazonite, smoky quartz, fluorite, goethite, and other related pegmatite mineral <br />specimens. A John Deere 992 track hoe and/or 690 was used along with an appropriate <br />air compressor and water buffalo. Exploration occurred at Site E. An access road was put <br />in from F.S. Road 752 across the Two Point claim to access Site E. Site E was partially <br />reclaimed and made safe for the winter. <br />Permit M-2006-034 Changes 2007: <br />In conjunction with Glacier Peak Mining LLC, Colorado Calumet Co. Inc. submitted an <br />amendment to include limited blasting at Site M on the Blue Streak No. 1 claim. The <br />blasting plan was approved on 12 June 2007. The U.S.F.S. approved the amendment 9 <br />Nov 2007. Blasting, however, will not occur at this site for at least another season. <br />May Depicting Operations: <br />Attached is a map which shows the four claims covered under this mining permit. The 14 <br />permitted excavation sites are labeled by letters A through N and are indicated by dashed <br />lines, either rectangular or circular, on the map. An orange area within a permitted site <br />indicates an open excavation where work will resume during next season. Presently there <br />is an open excavation at Site E on the Blue Streak No. 2. Green shaded areas are <br />excavations that have been refilled, re-contoured and reseeded. Blue shaded areas would <br />indicate reclamation over 80 percent recovered. No sites are yet 80 percent recovered. <br />Current Disturbances (2007): <br />An area of 0.24 acre total was excavated during 2007 operations. This site was filled, re- <br />contoured, and reseeded at the end of the season except for a small area on the west end <br />where operations will -resume in 2008. <br />An access road was also constructed to this site from F.S. Road 752 across the Two Point <br />claim. The road was water-barred and bermed. Additionally, it was temporarily seeded to <br />prevent erosion. A U.S.F.S. approved gate was installed at the intersection with Road <br />752.