Laserfiche WebLink
STATE OF COLORADO <br />DIVISION OF RECLAMATION, MINING AND SAFETY <br />Department of Natural Resources <br />1313 Sherman St., Room 215 <br />Denver, Colorado 80203 <br />Phone: (303) 866-3567 <br />FAX: (303) 832-8106 <br />June 19th, 2008 ? <br />Tim Huskey <br />COLORADO <br />D IV IS I ON OF <br />RECLAMATION <br />MINING <br />SAFETY <br />Bill Ritter, Jr. <br />Governor <br />County Road Supervisor Harris D. Sherman <br />Executive Director <br />1010 N. Guyrene St. Ronald W. Cattany <br />P.O. Box 608 Division Director <br />Dove Creek, CO 81324 Natural Resource Trustee <br />Re: Pribble Pit, M-2008-020, Dolores County, Second Adequacy Review of <br />110 (c) application <br />Dear Mr. Huskey, <br />On June 16th, 2008, the Office received your responses to the preliminary adequacy <br />review conducted for the above referenced application. Overall, your responses were <br />appropriate; however, some clarification is needed on several points. Also, the public <br />notice was not published and sent in the correct format. The public notice process will <br />need to be redone, and the public must have adequate time to submit comments or <br />objections to the Division. Given this issue, the office will not be able to approve the <br />application by the decision date of June 28th, 2008. It is not within the offices power to <br />extend the review period, so it recommended that you request and extension of the <br />decision date to appropriately address the following concerns. <br />6.3.3 Exhibit C- Minim plan <br />The process of topsoil removal, segregation and replacement was described very clearly. <br />Based on the time frame outlined in your response, the topsoil stockpiles life appears to <br />be about a year to a year and a half. In general, the office recommends that if a topsoil <br />stockpiles life is greater than 180 days, it should be seeded with a fast growing grass <br />species after the pile has been constructed, to stabilize it from wind and water erosion. <br />Please describe how the topsoil stockpile will be stabilized once the topsoil is piled and <br />segregated, please include a description of the grass seed mix that will be used. <br />6.3.4 Exhibit D - Reclamation Plan <br />For the revegetation plan, you stated that the area will be seeded with a "Pastureland <br />Mix," please provide more information about the seed mix that will be applied. Please <br />list the species of grasses that will make up the mix, and how many pound of live seed <br />per acre will be applied for each the grass species contained in the mix. This is pursuant <br />to rule 6.3.4 (c) (iii). <br />Office of Office of <br />Mined Land Reclamation Denver • Grand Junction • Durango Active and Inactive Mines