Laserfiche WebLink
• <br />PR-12 Exhibit 71 <br />'rahle R- Summarv of the Sm int? and Seen 1VMonitorinta Plan (Continued) <br />24 <br />Monitoring Station Monitored Area Flow Measurement Field WQ <br />H, EC, T Annual Lab Water <br />QuslitV Period of Record <br />Springs in or below the Fseam in the North Fork Drainage Basin <br /> Unnamed drainage east of Box <br />Spring 11-2 Canyon, north of Box Canyon 3 x Year 3 x Year Peak Flow Period o' 2000 to present <br /> Panel s <br />Spring 10-1 Lower Box Canyon, north of 3 x Year 3 x Year Peak Flow Period ° 1999 to present <br /> ox Canyon Panels <br /> Unnamed drainage east of Syl. <br />Spring E10-2 Gulch, north of Box Canyon 3 x Year 3 x Year Peak Flow Period m 1996 to present <br /> Panels <br /> Unnamed drainage east of Syl. <br />Spring 15-1 Gulch, north of Box Canyon 3 x Year 3 x Year Peak Flow Period o' 1996 to present <br /> Panels <br />Spring G-1 a Syl. Gulch, north of NE mine 3 x Year 3 x Year Peak Flow Period of 1983 to present <br /> panel s <br />Spring G-20 Mddle Syl. Gulch, north of 3 x Year 3 x Year Peak Flow Period" 1979 to present <br /> mine facilities <br />Springs above the B seam in the Jumbo Mountain Area in the North Fork Drainage Basin <br />Spring CR-12 (decreed spring # 12) one Pine Gulch, North of NW 3 x Year 3 x Year Peak Flow Period o' 1993 to present <br /> mine panels <br />Spring G-26a Lone Pine Gulch, North of NW 3 x Year 3 x Year Peak Flow Period ` 1980 to present <br /> mine panels <br />Spring G-28a (20) Gribble Gulch, North of NW 3 x Year 3 x Year Peak Flow Period of 1978 to present <br /> mine panels <br />Spring G-31 - Jumbo Spring No. 4 Pond Upper Gribble Gulch Jumbo <br />tn. mine panels and west of <br />3 x Year <br />3 x Year <br />Peak Flow Period <br />1977 to present <br />(decreed spring #23) mine panels <br /> Upper Gribble Gulch, north of <br />Spring G-30 Jumbo Mtn. mine panels and 3 x Year 3 x Year Peak Flow Period of 1977 to present <br /> west ofNW mine panels <br />Spring G-25 - Jumbo Spring No. 2 Pond Lower Gribble Gulch north of <br />Jumbo Mtn. mine panels and <br />3 x Year <br />3 x Year <br />Peak Flow Period <br />1977 to present <br />(decreed spring #22) west ofNW mine Panel* <br />Spring G-35 - Jumbo Pipeline & Spring Drainage west of Gribble, 3 x Year 3 x Year Peak Flow Period" 1993 to present <br />No. 5 (decreed spring # 18) Jumbo Mtn. mine panels <br />Spring G-49a - Jumbo Spring and rainage west of Gribble 3 x Year 3 x Year Peak Flow Period o 1995 to present <br />Pipeline Gulch, Jumbo Mtn. mine panels <br /> <br />Springs above the E seam in the Dry Fork Drainage Basin <br />Spring J4 M. Dry Fork SOD Area 3 x Year 3 x Year Peak Flow Period 1981 to present <br />Deer Creek Spring (baseline)" Deer Creek; SOD Area 6 x Year 6 x Year 6 x Year 2006 <br />Deer Creek Sprina (normal)" Deer Creek, SOD Area 3 x Year 3 x Year 3 x Year to 2007 to future <br />WCC-24 (baseline)" ower Dry Fork-, SOD Area 6 x Year 6 x Year 6 x Year'' 2006 <br />WCC-24 (normal)`'' Lower Dry Fork, SOD Area 3 x Year 3 x Year 3 x Year 2007 to future <br />J-2 (baseline)'' Lick Creek, SOD Area 6 x Year 6 x Year 6 x Year'`' 2006 <br />1-2 (normal) Lick Creek, SOD Area 3 x Yeaz 3 x Year 3x year (21 2007 to future <br />J-7 (baseline)"' Poison Gulch, SOD Area 6 x Year 6 x Year 6 x Year' 21 2006 <br />J-7 (normal)"' Poison Gulch, SOD Area 3 x Year 3 x Year 3 x Year'" 2007 to future <br />1) For sites with more than 5 years of data. Lab parameters include i SS, DS, Cond., prL and re taus n iol). <br />2) For sites Niith less than 5 )'cars data, See Tahlc 5 <br />3) New additions to morutorin_ program in 2006 <br />4) New additions to monitoring program in 2007. <br />September 2007 Fh°droGeo, Inc. <br />u