Laserfiche WebLink
Z The Type and Approximate Quantity ofFerdlizer, Organic Material or Soil Condidoner Used <br />and Location of Use <br />None <br />S. Estimates of the Location and Number ofAcres to be Affected in the next Report Year <br />The next pit will be advanced to the west of and parallel to the active pit as shown on the 2007-08 Annual <br />Reclamation Map. Therefore, the potential disturbance for 2008-09 is not expected to exceed: <br />Active Pit Advance - 2.0 acres <br />Topsoil Removal - 2.0 acres <br />9. The Effective Date of this Informadon Provided Above Shall be No More than 45 Days Prior <br />to the Anniversary Date <br />For the sake of continuity, the effective date of this information is from June 1, 2007 to June 1, 2008. <br />2