My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-06-05_INSPECTION - M2007067
DRMS
>
Day Forward
>
Inspection
>
Minerals
>
M2007067
>
2008-06-05_INSPECTION - M2007067
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:32:31 PM
Creation date
6/6/2008 8:27:01 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2007067
IBM Index Class Name
INSPECTION
Doc Date
6/5/2008
Doc Name
Inspection report
From
DRMS
To
Marathon Oil Company
Inspection Date
5/19/2008
Email Name
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(Page 3) <br />MINE ID # OR PROSPECTING ID #: M-2007-067 <br />INSPECTION DATE: 5/19/2008 <br />INSPECTOR'S INITIALS THM <br />The following problems (PB) and/or possible violations (PV) (and suggested corrective actions) were identified during this <br />inspection. The problems should be corrected by the dates given, or they will become possible violations. The possible <br />violations should be corrected by the dates given to reduce their severity when considered by the Mined Land Reclamation <br />Board. The inspector noted on the previous page should be notified of all corrective actions taken. <br />PROBLEMS/POSSIBLE VIOLATIONS <br />AND <br />CORRECTIVE ACTIONS <br />CORRECTION <br />DATE <br />1 Topsoil appeared to be used for berm construction around the perimeter of the mine and 7/18/08 <br />as part of the storm water settling ponds. Per Rule 3.1.9(1), where it is necessary to <br />remove overburden in order to mine the construction material, topsoil shall be removed <br />and segregated from other spoil. <br />PB or PV: _2B <br />TOPIC(S): --TS- <br />Corrective Action: - <br />Segregate the topsoil and place in the location indicated on the Mine Plan Map which shows the <br />topsoil stockpile along the west perimeter of the gravel mine. Please submit photo <br />documentation that proves this request has been carried out. <br />I, Travis Marshall, hereby certify that on June 4, 2008, 1 deposited a true and complete copy of this foregoing inspection <br />report in the United States Mail, first class postage paid, to the operator of record for this site at the address i • a <br />and to those others within the body of this report who have been designated to receive co -{ pers <br />excepted). <br />Signature
The URL can be used to link to this page
Your browser does not support the video tag.