Laserfiche WebLink
the road corridor will be recovered and placed in a stockpile at the north end of the road corridor beyond the edge <br />of the 35-foot road disturbance area, and topsoil from the pad area will be placed in a stockpile within the shaft pad <br />on the southwest edge of the pad for future reclamation use. The topsoil salvage volumes are indicated on Table <br />49A. Natural vegetative materials (mulch) incorporated into the topsoil, and seeding with the topsoil stockpile <br />stabilization seed mixture identified on page 2.05-121 will stabilize the stockpiled topsoil. <br />• <br />U <br />TR07-62 2.05-84.4 ~~,~~,~~ ~'~~ ~ ~~ ~'~~~~~U2/04/08 <br />