RESPONSE
<br />See response to 2.05.4, Reclamation Plan, below for details concerning the Foidel Creek Mine. Twentymile Coal
<br />• Company does not propose to disturb any additional land within the Fish Creek Tipple permit area. The Fish Creek
<br />Tipple and adjoining haulroad were constructed prior to the promulgation of regulations mandating topsoil salvage
<br />and storage. Thus, the best plant growth medium available is a mixture of spoil and soil materials which will be
<br />substituted for topsoil. This situation is further discussed within the Fish Creek Tipple/Loadout Appendix, pages
<br />2.04-36 through 2.04-38 and pages 2.05-37 through 2.05-38 of Volume VIII.
<br />Eastern Mining District Dewatering Facility -The Eastern Mining District Dewatering Facility will require
<br />salvaging and stockpiling approximately 13,360 CY of topsoil from the access road and the facility site. During
<br />upgrading of the road, approximately 3,600 CY of topsoil will be windrowed to the side of the road. The topsoil
<br />along the length of the road is approximately 30 inches deep. The facility site will require salvaging and
<br />stockpiling approximately 8,300 CY of topsoil. The topsoil from the site area is approximately 30 inches deep. A
<br />test pit will be dug to verify the topsoil depth obtained from previous soil mapping work. The stockpiled topsoil,
<br />which is located within the pad area, will be stabilized with the topsoil stockpile stabilizing seed mixture.
<br />Additionally, approximately 6,295 CY of topsoil will be salvaged from the treatment pond site. This site has been
<br />relocated closer to the road to facilitate delivery of chemicals.
<br />Bleeder Fan -The bleeder fan facility will require salvaging and stockpiling approximately 4,700 CY of topsoil
<br />from the access road and the facility site. During the upgrading of the road, approximately 2,800 CY of topsoil will
<br />be windrowed to the side of the road and left in place. The 1,200 CY that will be salvaged from the road extension
<br />will be placed in the stockpile that will be established on the fan pad. In addition to the topsoil stockpiled from the
<br />road extension, approximately 740 CY will be salvaged and stockpiled from the pad. The soil resources
<br />information was derived from information presented in Exhibits 7 and 8, Soil Profile Description and Soil Mapping
<br />Unit Descriptions, Map No. 19, Mine No. 3, Soils presented in permit C-84-062. These materials are incorporated
<br />herein by reference. At the bleeder fan site, Twentymile will establish a test pit to verify topsoil depths prior to
<br />salvaging topsoil. The stockpiled topsoil, which is located within the pad area, will be stabilized with the topsoil
<br />stockpile stabilizing seed mixture. Prior to salvaging any topsoil from the site, a T & E species reconnaissance for
<br />Ute Lady's Tresses, Spiranthes diuvialis, will be conducted, and the results forwarded to the Division. It is not
<br />anticipated that this species will be found, as the site appears to be outside of its natural range.
<br />18 Right Ventilation Shaft (TR04-44)
<br />Approximately 4,400 feet of the access road crosses upland areas, with the remaining 2,700 feet crossing lowland
<br />areas where road construction will involve removal of any large vegetation and stripping and stockpiling of other
<br />vegetation, topsoil, and organic materials. Similarly, the shaft pad is located in an upland area. Given an average
<br />topsoil depth of approximately 6 inches in the upland area and a total road disturbance area of approximately 5.7
<br />acres, approximately 4,600 cubic yards of topsoil will be salvaged from the road corridor, and 2,000 cubic yards
<br />from the 2.5 acre pad area. Prior to initiating topsoil removal activities, stream/wetland buffer zones will be
<br />marked with identifying signs to prevent surface disturbance within buffer zone areas. The topsoil from the road
<br />corridor was initially windrowed adjacent to the road and topsoil from the pad area was placed in a stockpile
<br />adjacent to the shaft pad and within the road corridor, for future reclamation use. As a result of concerns related to
<br />protection of windrowed topsoil from erosion and contamination, a decision was made to recover topsoil from the
<br />windrows and place it in stockpile. The topsoil salvage volumes are indicated on Table 49A. Seeding with the
<br />topsoil stockpile stabilization seed mixture identified on page 2.05-121 will stabilize the windrowed and stockpiled
<br />topsoil.
<br />6-North Mains Ventilation Shaft (TROS-48)
<br />Along the 2,930-foot access road, construction will involve removal of any large vegetation and stripping and
<br />stockpiling of other vegetation, topsoil, and organic materials. Similarly, the shaft pad is located in an upland area.
<br />• Given an average topsoil depth of approximately 6 inches in the upland area and a total road disturbance area of
<br />approximately 2.4 acres, approximately 1,940 cubic yards of topsoil will be salvaged from the road corridor, and
<br />8,954 cubic yards from the 11.1 acre pad area. Prior to initiating topsoil removal activities, wetland buffer zones
<br />will be marked with identifying signs to prevent surface disturbance within the buffer zone areas. The topsoil from
<br />TR07-62 2.05-84.3 ~~P~~~~ ~~~~ "~ ~~~ ~~ ~~ 02/04/08