Laserfiche WebLink
CIRCES Cost Estimatinn Software <br />BULLDOZER WORK <br />PROJECT IDENTIFICATION <br />Task # : 005 State :Colorado Permifrob# : C-1981-047 <br />Date : 09/13/7007 County :Delta Abbreviation :none <br />User : JRS Site :Blue Ribbon Mine Filename : C047-005 <br />Agency or organization name :Colorado Division Of Reclamation, Mining And Safety <br />Permit or other job action : Permit Renewal 05 <br />Task description : Bacld'ill and Regrade Sediment Pond #4 <br /> <br />HOURLY EQUIPMENT COST <br /> Basic machine :Cat D8R Series 11 - 8SU (200; Horsepower : 310 <br /> Blade type :Semi-Universal <br /> Attachment no. 1 : ROPS Cab Shift basis : 1 per day <br /> Attachment no. 2 :3-shank ripper <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cost/hour : $58.24 NA <br /> Operating cost/hour : $73.75 100 <br /> Ripper op. cost/hour : $0.00 0 <br /> Operator cost/hour : $32.78 NA <br /> Total unit cost/hour : $164.77 Total fleet cosUhour : $164.77 <br /> <br /> <br />MATERIAL QUANTITIES ;:; <br /><.;: <br />Initial Swell Loose <br />volume : 370 ~ CCY factor : 1.125 volume : 416 LCY <br /> <br />Source of estimated volume :1990 Reclamation Cost Estimate <br />Source of estimated swell factor :CAT Handbook <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 100 feet Material consistency : 0.90 (Cat HB) <br />Unadjusted hourly production : 852.6 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility : 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (lshifUday) <br />Compacted fill or embankment Spoit pile : 0.80 (fnd-rt) <br /> Push gradient : _ _1.00 (Cat HB) <br />Average push gradient : _0.00_ _% (pos) <br />~ Altitude : 1.00 (Cat HB) <br />_ <br />Average site altitude :_ ___ _ <br />_6,400 feet 1 <br />- _ _ <br />Material weight : _ <br />_ <br />0.87 ! (Cat Ht3) <br /> __ <br />Blade type : 7.00 _ -_-~ (S/SURI) <br />Material weight :_ 2,650 Ibs/LCY Net correction : 0.39 <br />Weight description : _ <br />- - <br />Decomposed rock - 25% Rock, 75% Earth Adjusted unit production : 331.54 LCY/hr <br /> Adjusted fleet production : 331.54 LCY/hr <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) Total job time : 1.26 Hours <br />Unit cost : $0.497 /LCY Total job cost : $207 <br /> <br />