My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-02-19_PERMIT FILE - C1981047
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981047
>
2008-02-19_PERMIT FILE - C1981047
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:22:59 PM
Creation date
6/5/2008 10:46:15 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981047
IBM Index Class Name
Permit File
Doc Date
2/19/2008
Section_Exhibit Name
Reclamation Cost Estimate RN5
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Basic machine :Cat D8R Series /l - 8SU (200: Horsepower : 310 <br /> Blade type :Semi-Universal <br /> Attachment no. 1 : ROPS Cab Shift basis : 1 per day <br /> Attachment no. 2 : 3-shank ripper <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cost/hour : $58.24 NA <br /> Operating cosUhour : $73.75 100 <br /> Ripper op. cost/hour : $0.00 0 <br /> Operator cost/hour : $32.78 NA <br />......................... ................ . <br />Total unit cost/hour : $164.77 Total <br />fleet cosUhour : $164.77 <br />,. <br />MATERIAL DUANTITIES <br />Initial Swell Loose <br />volume : 849 LCY factor : NA volume : 849 LCY <br />Source of estimated volume :1990 RCE <br />Source of estimated swell factor : NA ` <br /> <br />,. <br />HOURLY PRODUCTION <br />, <br />,: , <br />Job Condition Correction Factors <, <br /> <br />Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 100 feet Material consistency : 0.90 (Cat HB) <br />Unadjusted hourly production : 852.6 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility : 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (1shifdday) <br />Compacted fill or embankment Spoit pile : 0.80 (fnd-rfJ <br /> Push gradient : 1.00 _ __(C_at HB <br />~ ) <br />Avera a ush radiant : <br />g p g __ 0.00 <br />% <br />(pos) Altitude : 1.0 <br />0 (Cat HB) <br />Average site altitude : _ ___ <br />________ <br />_ <br />__ <br />6, 400 feet ; Material weight : __ <br />_ <br />_ _ <br />0.87 ~ (Cat HB) <br /> ____ <br />Blade type : __ <br />1.00 ___ <br />r (S/SUN) <br />Material weight : 2, 650 1bs/LCY ~ Net correction : 0.39 <br />Weight description <br />Decomposed rock - 25% Rock, 75% Earth Adjusted unit production : 331.54 LCY/hr <br /> Adjusted fleet production : 331.54 LCY/hr <br /> <br />JOB TIME AND COST >: <br />Fleet size : 1 Dozers) Total job time : 2.56 Hours <br />Unit cost : $0.497 /LCY Total job cost : $422 <br />
The URL can be used to link to this page
Your browser does not support the video tag.