My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-03-10_GENERAL DOCUMENTS - M1977247
DRMS
>
Day Forward
>
General Documents
>
Minerals
>
M1977247
>
2008-03-10_GENERAL DOCUMENTS - M1977247
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:24:39 PM
Creation date
6/5/2008 8:35:56 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977247
IBM Index Class Name
GENERAL DOCUMENTS
Doc Date
3/10/2008
Doc Name
Scope of work for preblast surveys & water well analysis
From
Holcim
To
DRMS
Email Name
ACS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
186
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
?l <br />ACZ Laboratories, Inc. August 10, 2007 <br />Quality Assurance Plan Version 12 <br />SOPAD018.08.07.12 Page 25 of 96 <br />5 TECHNICAL TRAINING <br />Prior to the independent generation or review of data for client samples (including PT samples), all analysts <br />must undergo a formal, documented training process. Technical personnel must be thoroughly trained in the <br />analytical techniques and operating principles and procedures for the methods utilized by ACZ. This process <br />includes but is not limited to: reading the associated published method, reading all related SOPS, improving <br />laboratory skills, learning troubleshooting, maintenance, and operating procedures for pertinent equipment and <br />1 instruments, and creating workgroups and reviewing data through the LIMS database. <br />It is the responsibility of the department supervisor to determine that a new analyst is properly trained, has <br />successfully completed all initial training requirements and is prepared to commence work on client samples. <br />Under no circumstances may any analyst independently generate client data before receiving the explicit <br />approval of the QA/QC department. <br />5.1 The effective version of the test SOP provides the framework for training for all sample preparation <br />and analysis. The SOP is typically based on published approved methodologies (EPA or other) and <br />incorporates any necessary activities and protocols not included in the published method(s) as well as <br />1 requirements stipulated by other regulatory agencies. <br />5.2 Training for data AREV or SREV only must be documented as specified in section 2.3.6. <br />5.3 Each employee must be trained either by the department supervisor or by an analyst within the <br />department who is proficient in the area of testing and has been designated by the supervisor. Anyone <br />performing training must meet the following requirements: <br />1) Documentation of training on the effective version of the test SOP. <br />2) Documented approval for the analysis. <br />I 3) A current IDOC or CDOC. <br />5.4 Initial training is documented using the Initial Method Training form (FRMQA004). Once training has <br />been completed, the trainee and the instructor fill out the form together to ensure all pertinent <br />information has been addressed and to ensure the trainee comprehends the material and is provided an <br />opportunity to ask questions or request additional training. The trainee's signature is an attestation that <br />he/she has read, understands, and agrees to always follow the effective version of the SOP. <br />5.5 To demonstrate an aptitude for the procedure, the analyst must perform a successful Initial <br />Demonstration of Capability (IDOC) prior to independent preparation and/or analysis of client samples. <br />Performance is documented using FRMAD023. The data is reviewed initially by the department <br />supervisor and the analyst (AREV), and both individuals must initial and date the review checklist. <br />5.6 SREV for any preparation workgroup is performed by the department supervisor or a qualified analyst, <br />and SREV for any analytical workgroup is performed by QA/QC. <br />5.7 Prior to performing an IDOL, a new analyst should be provided sufficient opportunity to practice the <br />procedure. This confirms the analyst understands the procedure and feels comfortable performing the <br />procedure independently. Data associated with any practice is not submitted to QA/QC. <br />5.8 It is not necessary for the first IDOC attempt to pass; however, the supervisor needs to review the <br />' analyst's techniques if multiple attempts do not pass. <br />2773 Downhill Drive 970-879-6590 <br />Steamboat Springs, CO 80487 www.acz.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.