My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-03-13_PERMIT FILE - C1992081A (3)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1992081A
>
2008-03-13_PERMIT FILE - C1992081A (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:24:58 PM
Creation date
6/4/2008 5:29:55 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1992081A
IBM Index Class Name
Permit File
Doc Date
3/13/2008
Section_Exhibit Name
Tab 23 Bonding
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Engineering Work/Bid Preparation Fee <br />Some projects may need preplanning or re-engineering prior to reclamation. To <br />account for these costs, Graph 1, OSMRE Reclamation Bond Handbook was used to <br />estimate these fees. This was estimated at 4.25 percent of the contract amount. <br />Reclamation Management and Administration Fee <br />This fee represents the cost for management of the entire project. Usually this <br />is performed by a firm specializing in reclamation oversight. This was <br />estimated per Graph 3, OSMRE Reclamation Bond Handbook at 6.0 percent of the <br />contract amount. <br />• <br /> <br />TR-07 7 Revised 03/06 <br />
The URL can be used to link to this page
Your browser does not support the video tag.