Laserfiche WebLink
CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />PROJECT IDENTIFICATION <br />Task # : 002 <br />Date : 11/19/2007 <br />User : JRS <br />State :Colorado <br />County :Delta <br />Site :Bowie No. 1 Mine <br />Agency or organization name :Colorado Division Of Reclamation, Mining And Safety <br />Permit or other job action :Partial Phase I Bond Release SL-03 <br />Task description :Push Fill from Substation Zone 1-D to Road Cut Zone 2-D <br />....................................................................... <br />HOURLY EQUIPMENT COST <br />Basic machine : Cat D10R - IOSU (2005) <br />Blade type :Semi-Universal <br />Attachment no. 1 :ROPS Cab <br />Attachment no. 2 :3-shank ripper <br />Shift basis : 1 per day <br />Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cost/hour : $97.38 NA <br /> Operating costlhour : $138.49 100 <br /> Ripper op. cost/hour : $0.00 0 <br /> Operator cost/hour : $32.78 NA <br /> Total unit cost/hour : $268.65 Total fleet cost/hour : $1,074.59 <br />.::::::::::::::::::::::::::::::::::::::::::::::::::::::::............... <br />MATERIAL QUANTITIES ........................................................ .......................................... <br />Initial Swell Loose <br />volume : 789 C CY factor : 1.165 volume : 919 LCY <br /> <br />Source of estimated volume :Map 5C-6A and 8A-2 <br />Source of estimated swell factor :CAT Handbook <br /> <br />__ ............... <br />HOURLY PRODUCTION .........:.:.:.:........_..................:....._....... ,......... _.......... <br />Job Condition Correction Factors .._..._._............... ....:; Source'>:.:. <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 150 feet Material consistency : 0.90 (Cat HB) <br />Unadjusted hourly production : 1,243.2 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility : 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (1shift/day) <br />Compacted fill or embankment Spoil pile : 0.80 (fnd-r~ <br /> Push gradient : 1.48 (Caf HB) <br />Average push gradient : 23.00 % (neg) Altitude : 1.00 (Cat HB) <br />Average site altitude : 7,110 feet Material weight : 0.79 (Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 2,900 Ibs/LCY Net correction : 0.53 <br />Weight description <br />Decomposed rock - 50% Rock, 50% Earth Adjusted unit production : 654.44 LCY/hr <br /> Adjusted fleet production : 2,617.78 LCY/hr <br /> <br />JOB TIME AND COST <br />Fleet size : 4 Dozers) Total job time : 0.35 Hours <br />Unit cost : $0.410 /LCY Total job cost : $377 <br /> <br />Permit/job# :C-1981-038 <br />Abbreviation :none <br />Filename :C038-002 <br />Horsepower : 570 <br />