Laserfiche WebLink
Agency or organization name :Colorado Division Of Reclamation, Mining And Safety <br />Permit or other job action :Partial Phase I Bond Release SL-03 <br />Task description :Push Fill from Zone 1-A to Zone 4-A at CSS Bench <br />HOURLY EQUIPMENT COST <br />Basic machine : Cat D10R - 10SU (2005) Horsepower : 570 <br />Blade type :Semi-Universal <br />Attachment no. 1 : ROPS Cab Shift basis : 1 per day <br />Attachment no. 2 :3-shank ripper <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cost/hour : $97.38 NA <br /> Operating cost/hour : $138.49 100 <br /> Ripper op. cost/hour : $0.00 0 <br /> Operator cost/hour : $32.78 NA <br /> Total unit cost/hour : $268.65 Total fleet cosUhour : $1,074.59 <br />.:::::::::::::::::::::::::::::::::::::::::::::::::::::::::..:........... <br />MATERIAL QUANTITIES ........................................................ ..................................................... <br />Initial Swell Loose <br />volume : 48,923 CCY factor : 1.165 volume : 56,995 LCY <br /> <br />Source of estimated volume :Map 5C-6A and 8A-2 <br />Source of estimated swell factor :CAT Handbook <br /> <br />,,,...,........ <br />HOURLY PRODUCTION ,, ..........................:...................,.... ,........ <br />Job Condition Correction Factors ;;::.:Source .,.::. <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 275 feet Material consistency : 0.90 (Cat HB) <br />Unadjusted hourly production : 680.0 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility : 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (lshift/day) <br />Compacted fill or embankment Spoil pile : 0.80 (fnd-rf) <br /> Push gradient : 0.30 (Cat HB) <br />Average push gradient : 30.00 % (pos) Altitude : 1.00 (Cat HB) <br />Average site altitude : 6, 900 feet Material weight : 0.79 (Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 2,900 Ibs/LCY Net correction : 0.11 <br />Weight description <br />Decomposed rock - 50% Rock, 50% Earth Adjusted unit production : 72.03 LCY/hr <br /> Adjusted fleet production : 288.10 LCY/hr <br /> <br />JOB TIME AND COST <br />Fleet size : 4 Dozers) Total job time : 197.83 Hours <br />Unit cost : $3.730 /LCY Total job cost : $212,587 <br /> <br />