Laserfiche WebLink
sheet 1 of 2 <br />CIRCES Cost Estimating Software <br />SCRAPER TEAM WORK <br />PROJECT IDENTIFICATION <br />Task # <br />Date <br />User <br />Agency or organization name :Colorado Division Of Reclamation, Mining And Safety <br />014 State :Colorado PermiUjob # : C-1981-038 <br />11/20/2007 County :Delta Abbreviation :none <br />JRS Site :Bowie No. 1 Mine Filename :C038-014 <br />Permit or other job action :Partial Phase 1 Bond Release SI-03 <br />Task description :Haul Fill from Sfotage Zone 1-B to Coal Zone 4-B <br />.............................................................................................. <br />HOURLY EQUIPMENT COST <br />Shift basis : 1 per day <br />ipment Description <br />Cost Bre <br />Scraper work team -Scraper :Cat 637G w/push-pull <br />-Push dozer:NA <br />Support equipment -Load area :NA <br />-Dump area :NA <br />Road maintenance -Motor grader :CAT 14H <br />-Water truck :Water Tanker, 5, 000 Gal. <br />akdown : Scraper Work Team <br />Scraper Dozer Support Equipment <br />Load area Dump area Road Maintenance Equipment <br />Grader Water truck <br />Import data filename : scraper2 NA NA NA grader misctruk <br />Utilization-machine : 100 NA NA NA 25 25 <br />-Ripper attachment : NA NA NA NA 0 NA <br />Ownerhip cosUhour : $110.37 NA NA NA $39.60 $21.89 <br />Operating cost/hour : $177.86 NA NA NA $12.13 $8.68 <br />Ripper op. cost/hour : NA NA NA NA $0.00 $0.00 <br />Operator cost/hour : $24.95 NA NA NA $24.47 $33.94 <br />Unit subtotals : $313.18 NA NA NA $76.20 $64.51 <br />Number of units : 2 0 0 0 1 1 <br />Group subtotals : Work : $626.35 Support : $0.00 Maintenance : $140.71 <br />Total work team cost/hour : $767.06 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 25,145 CCY factor : 1.165 volume : 29,294 LCY <br />Source of quantity take-off :Map 5C-6A and 8A-2 <br />Source of estimated swell factor :CAT Handbook <br />