Laserfiche WebLink
HOURLY PRODUCTION sheet 2 of 2 <br />Hauling Caaacity <br />Scraper Payload (weight) Basis : ~ Scraper Bowl (volume) Basis <br />Material weight : 2,900 pounds/LCY <br />Material description <br />Decomposed rock - 50% Rock, 50% Earth <br />Rated payload : 75,000 pounds <br />Payload capacity : 25.86 LCY <br />Cycle Time <br />Scraper loading time * : 1.00 <br />Maneuver and spread time : 0.60 <br />`load time per scraper pair on push-pull models <br />Struck volume : 24.00 LCY <br />Heaped volume : 34.00 LCY <br />Average volume : 29.00 LCY <br />Adjusted capacity : 25.86 LCY *** <br />hourly production reflects volume per scraper pair on push-pull models <br /> Job Condition Corrections : Site altitude (ft.) : 7,100 <br /> Scraper Push dozer Source <br />minutes Altitude adj.: 1.000 NA (Cat HB) <br />minutes Job efficiency : 0.830 NA (Cat HB) <br /> Net correction : 0.830 NA <br />Travel time <br />Road condition description :Firm, smooth, rolling, dirt/It. surfaced, watered, maintained <br />Haul Route <br />Seg. # Haul distance (feet) Grade (%) Roll. res. (%) Total res. (%) Velocity (fpm) Travel time (min.)** <br />1 600 12.00 3.00 15.00 589 1.03 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Haul time : 1.03 minutes <br />Return route <br />'* travel time for each segment is adjusted for acceleration/deceleration. Return time : 0.36 minUteS <br />table velocities are max. attainable per total resistance shown, not average <br />Total scraper team cycle time (load + haul + maneuver and spread + return) : 2.99 minutes <br />Unadjusted unit production/hour : 1,039.49 LCY/hour *** Adjusted for job conditions : 862.78 LCY/hour <br />Optimal number of scrapers per push dozer : NA Selected number of scrapers : 2 scraper(s) <br />Adjusted single scraper team (unit) hourly production : 862.78 LCY/hour <br />Adjusted multiple scraper team (fleet) hourly production : 862.78 LCY/hour <br /> <br />.:::::::::,,:::::,.::::.,,,.::::.,:::,,,:.:.:,,,: ..::.::.:::::::::::::::::.:::.::::::::::::,,.:::::,,:,,::,,:::,,,,,,, :.::.::.:.:.,:::, :.:.::::::::::::,,,,,.:::::.:::::,..,.:...................... <br />....... <br />JOB TIME AND COST ............................... ................................. <br />Fleet size : 1 Team(s) Total job time : 49.50 Hours <br />Unit cost : $0.889 /LCY Total job cost : $37,971 <br /> <br />