My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-04-02_PERMIT FILE - C1981038
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981038
>
2008-04-02_PERMIT FILE - C1981038
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:26:44 PM
Creation date
6/4/2008 10:49:56 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981038
IBM Index Class Name
Permit File
Doc Date
4/2/2008
Section_Exhibit Name
Reclamation Cost Estimate RN5
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
128
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PER/n?7` ~N~.wA L Na .5 <br />Bowie No. I1 Mine C-81-03 <br />Task: 000 Site: Bowie No. 1 Mine ~~ Date: 21 Nov 07 User: JRS <br />Permit Action• '~ P~~-r RFNEw»L N6. 5 Cow <br />Fil <br />N Delta <br />C-1981-038 <br />Descri lion: Cost S '' ame: <br />e <br />Ta k Reclamation Task Descri tioa Hours Direct C <br /> II <br /> 00 <br />$502 <br />074 -Recut Haul Road Ditches !, 3.59 . <br />00 <br />$868 <br />075 -Construct 2730' of 3' Ditches 6.21 <br />96 <br />35 ' <br />00 <br />021 <br />$5 <br />076 -Construct 4340' of 12' Ditches . <br />0 <br />97 . <br />, <br />037 <br />00 <br />$1 <br />078 -Backfill OVM Pi line Removal Trench . <br />1 <br />71 . <br />, <br />00 <br />$239 <br />079 -Establish Irri lion Ditch at Story a and Loadout . <br />04 <br />4 . <br />00 <br />838 <br />$15 <br />081 -Ri ra Placement '! . . <br />, <br /> 05 <br />3 00 <br />$632 <br />085 -Backfill and Re de Pond, l . <br />47 <br />2 . <br />$514 <br />00 <br />086 -Backfill and Re Pond 2 . <br />52 <br />2 . <br />00 <br />5524 <br />O87 -Backfill and Re de Pond 3 . <br />91 <br />2 . <br />$605 <br />088 -Backfill and Re a Pond 4 . <br />10 <br />77 • <br />503 <br />00 <br />$1 <br />089 -Remove Concrete Pond Dams . <br />31 <br />2 . <br />, <br />00 <br />$479 <br />091 -Backfill and Re Waste Pile Pond . <br />2 <br />83 . <br />00 <br />$586 <br />092 -Backfill and Re a Timber Story a Pond . <br />00 <br />1 . <br />00 <br />$208 <br />p93 -Backfill and Re a Coa1~~Stoc ile Pond . <br />2 <br />88 . <br />00 <br />$597 <br />095 -Backfill and Re de Pond W-1 . <br />88 <br />2 . <br />00 <br />$597 <br />096 -Backfill and Re de Pond W-2 . . <br /> u <br /> . <br />4 <br />89 <br />00 <br />256 <br />$5 <br />100 -R lace T soil from Stoc ile to Waste Dis sal Area . . <br />, <br />00 <br />674 <br />$27 <br />101 -Move Fill To soil Pile into Stoc filed Area 25.75 . <br />, <br />211 <br />00 <br />$51 <br />102 -R lace To soil from Stoc file to OVWM 47.66 . <br />, <br />00 <br />349 <br />$12 <br />103 -R lace To soil from Stoc file to R laced Fill 11.49 <br />84 <br />2 . <br />, <br />00 <br />055 <br />$3 <br />104 -R lace To soil from Stoc file to OVWM Vent Shaft Access <br />' <br />' . <br />94 <br />5 . <br />, <br />00 <br />167 <br />$10 <br />105 il to OVM <br />, <br />-Haul Stevens Gulch T so . . <br />, <br />00 <br />$478 <br />106 -Redistribute To soil at Truck Station 0.44 <br />44 <br />0 . <br />00 <br />$550 <br />107 -R lace To soil from Stoc file to OVM Main Diversion Ditch . <br />12 <br />71 . <br />00 <br />008 <br />$20 <br />108 -R lace T soil from Stoc file to Remainin Mine Site . <br />30 <br />0 . <br />, <br />00 <br />$324 <br />109 -R lace To soil from OVWM Slide Area . . <br />00 <br />5 <br />110 -R lace To soil from Stoc file to TR-38 Drill Pad 0.09 <br />81 <br />0 . <br />$9 <br />00 <br />$874 <br />111 -R lace To soil from Stoc file to TR-38 Light Use Road . <br />1 <br />55 . <br />00 <br />$321 <br />112 -R lace To soil from Stoc file to Pond W- 1 . <br />55 <br />1 . <br />00 <br />$321 <br />113 -R lace To soil from Stoc file to Pond W-2 - . . <br /> - _--- - <br />---- <br />- ent Shafts 120.00 ! $59,057. <br />118 -Seal OWM and OVWM V ---------- <br />-- <br />_..------- ~ ------------ ----------- --Y----- <br />_ _- ------- -- $35,559.00 <br />i 105.00 _ _ _ +_ - _- - ---------- - <br />125 - - ~Plu and Seal All Boreholes __--__-__-------- _---- -- -----.- +_._-_. , <br />130 -Rev elate OVM - 20.00 $33,701.00 <br />. - - ~- - - -.. - 24.44 $41,182.00 <br />131 -Reve~etate OVWM ~~ - - -- - - <br />- -- - -- <br />- ~-- - 82.28 $58,870.00 <br />13_2 -Reve etate Remainder of Mine Site _ ;- ---- <br />- - -- - - <br />133 ~-Reve elate Narrowed Haul Road Outslo~e _ _ _ 6.76 ~ $11,391.00 <br />- -- <br />137 ___ - -Demolish and Remove A11, Structures _400.00 $293,402.00- <br />146 ;-MobilizelDemobilize Equipment for Initial Reclamation ________~ ___ __12.29 _ $44,266.00 __ <br />- ----- <br />---- <br />--- T - i 6.00 $2,422.00 <br />147 ~-MobilizelDemobilize Equipment for Pond Cleaning ____ _, _ _ _-._~_. - _.__ ___._ _.-- <br />---------- -_.._ - - ~----.---6.00 $3,026.00 <br />148 '-MobilizelDemobilize Equipment for Pond Removal _ <br />l49 -MobilizelDemobilize Equipment for Site Maintenance 24.00 $43,001.00 <br />Summary Sheet Page 2 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.