My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-04-02_PERMIT FILE - C1981038
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981038
>
2008-04-02_PERMIT FILE - C1981038
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:26:44 PM
Creation date
6/4/2008 10:49:56 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981038
IBM Index Class Name
Permit File
Doc Date
4/2/2008
Section_Exhibit Name
Reclamation Cost Estimate RN5
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
128
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
.,, <br />t" <br />PEI`?/n 1 f- /~6n,~1~v~ L /43.5 <br />Bowie No.l 1 Mine C-81-038 <br /> <br />Task: 000 Site: Bowie No. 1 Mme <br />~~ _ ----- <br />Date: 21 Nov 07 <br />User: JRS <br />Permit Action: P6 ENE ~.- No , Coun Delta <br />Descri lion: Cost S '~I File Name; C-1981-038 <br />i <br />Task Recia " tlon Task Descrl tlo Hours Direct Cos <br />it <br />001 -Push Fill from Zone 1-A to Zone 4-A at CBcS Bench 197.83 $212,587.00 <br />002 -Push Fill from Substation Zone 1-D to Road Cut Zone 2-D 0.35 $377.00 <br />003 -Push Fill from Substation Zone 1-D to Road Cut Zone 2-E 0.63 $678.00 <br />004 -Push Fill from Outdo Zone 2-B to Portal Zone 4-C 0.10 $107.00 <br />005 -Push Fill from Zone 1-C to Water Tank Bench Zone 3-C 83.04 $89,288.00 <br />006 -Push Fill from Hi wall Tone 4-D to Portal Zone 4-C 2.74 $2,939.00 <br />007 -Push Fill from East Hi wall Zone 4-D to West Zone 4-D 1.93 $2,071.00 <br />008 -Haul Fill from C&S Zone 1-A to Portal Zone 4-C 121.03 ~ $209,351.00 <br />009 -Haul Fill from Stora a Zo>ie 1 -B to Road Cut Zone 2-C 0.83 $1,035.00 <br />010 -Haul Fill from Stora a Zone 1-B to Portal Zone 4-C 7.71 $13,410.00 <br />011 -Haul Fill from ROM Area to Portal Zone 4-C 25.81 $44,156.00 <br />012 -Haul Fill from ROM Area to Diversion Zones 3-A, 3-B and 3-C 284.28 $484,091.00 <br />013 -Haul Fill from Store a Zone 1-B to Warehouse Zone 2-A 49.50 $37,971.00 <br />014 -Haul Fill from Storage Zone 1-B to Coal Zone 4-B 31.49 524.1 S2_()n <br />015 -Haul Fill from Zone 1-E to;~Zone 2-D 0.34 $261.00 <br />016 -Haul Fill from Zone 1-D to, Zone 4-C 3.22 $2,470.00 <br />017 -Backfill Orchard Valle West Mine 24.09 $25,888.00 <br />019 -Re de TR-38 Drill Pad i~ 1.14 $305.00 <br /> <br />025 -Place Four Feet of Cover Material on Waste Dis osal Area 6.40 $6,877.00 <br />026 -Remove Te Waste;~Pile to Waste Dis sal Area 2.61 $3,662.00 <br />027 -Haul Foo Tint of Coal and~Mine Stoc files to Refuse Area 5.68 $7,012.00 <br /> ~~ <br />032 -Co act Waste Pile II 92.54 $12,341.00 <br />033 -Co act OVWM Road Backfill 25.34 $3,379.00 <br />034 -Co act Zones 2-A, C, D 'and E; 3-A, B and C; 4-A, B and C 434.52 $57,946.00 <br /> I~ <br />038 -Ri Cut Zones 1-A, B, C, D,; and E, 2-B; 4-D 27.72 $23,881.00 <br />041 ' -Ri Roads ; 0.12 $105.00 <br /> <br />045 -Remove Gravel on Roads to Ponds 3 and 4 2.19 $1,678.00 <br />049 -Re de OVWM Li t Access Road 4.38 $612.00 <br />050 <br />052 <br />-- i -Regrade Timber Storage Access Road _____ ____ <br />?-Regrade Old Waste Disposal Road <br />---- <br />~---~"---- ___ _ _8.36 <br />8.36 __ <br />' <br />~ <br />} _ $1,168.00 _ <br />$1,168.00 <br /> <br /> <br />053 <br /> <br /> <br />054 <br />- <br />O55 <br />056 <br />_ - <br />057 <br />-- <br />058 <br />__... _ <br />059 __ ____ <br />- <br />063 <br />064 <br /> <br />;-Regrade West Midge Dispo <br />sal Area <br /> <br />~-Finish Grade Lower Waste Di Road _ <br />~--_.~.---- ---- sisal --- __ <br />-Rip Outer 22'of Asphalt Haul Road <br />-Haul Asphalt from Haul Road to Portal Bench Zone 4-C <br />t __ ____._ --------- _-=~------ --- -- -- -- <br />'- Outs _o_f Haul Road_ ~' <br /> <br />_ -E~xc-avate Haul Road Outslope and Place at Tce _ _ _ _ ____ __ <br />- -- - - <br />_ _______ Regrade, TR-38 Light Use Road ____ <br />- <br />-Finish Grade All Reclamation Zones (1-4) <br />-Finish Grade U Waste Disposal Road _ <br /> <br />-- --~~_..____ <br />4.18 ----- <br />~- -- -- ------ <br />0.08 <br /> <br />0.10 <br />1.90 <br />-- -_- . <br />0.22 <br /> <br />_ __ , _ 19.49 <br /> <br />~ 2.62- ~ <br /> <br />____ _______23.78 <br />0.22 <br />----- <br />- --- <br /> <br />- - 1- <br />~ <br /> <br /> <br /> <br />~ <br /> <br /> <br />1 _ _ <br /> <br />_ - I <br /> <br />___ _ _ <br /> <br />___ <br />-$584.00 <br />- - -----_ - <br />$9.00 <br />- ------- - - <br />$84.00 <br />$3,000.00 <br />---.. -- <br />$193.00 <br /> <br />$2,721.00_____ _ <br /> <br />$2,813.00 __ <br /> <br />_$2,763.00 ___ <br />$25.00 <br />065 <br />066 <br />X068 <br />_069 -Finish Grade Crushing and Screening Road_ ____ <br />-Finish Grade OVWM <br />~-Finish Grade Waste Disposal~i Area <br />,-Finish Grade ROM Storage ea 0.08 <br />2.10 <br />6.15 <br />4.61 ~ $9.00 <br />$244.00 <br />$715.00 <br />$536.00 <br />Summary Sheet Page 1 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.