My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-04-02_PERMIT FILE - C1981038
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981038
>
2008-04-02_PERMIT FILE - C1981038
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:26:44 PM
Creation date
6/4/2008 10:49:56 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981038
IBM Index Class Name
Permit File
Doc Date
4/2/2008
Section_Exhibit Name
Reclamation Cost Estimate RN5
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
128
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Truck/Loader Team Work cont'd Task # : 011 sheet 2 of 2 <br />;;. ,. <br />Loading Tool Cycle Time : Number of loading tool passes required to fill truck : 3 passes <br />Excavators and front shovels -machine cycle time vs. job condition rating : NA <br />-selected value within basic rating : NA <br />Track loaders -material descr.: NA <br />-cycle time elements (min.) : Load <br />NA Maneuver: NA <br />Wheel and track loaders -unadjusted basic loader cycle time (load, maneuver, and dumE <br />Dump : 0.100 <br />0.625 minutes <br />Cycle Time Factors Loading Condition Description Factor (min.) Source <br />Material : Material 3/4" to 6"diameter 0.000 (Cat HB) <br />Stockpile : Conveyor or dozer piled 10 ft. high or less 0.010 (Cat HB) <br />Truck ownership : Common ownership of trucks and loaders -0.040 (Cat HB) <br />Operation : Constant operation -0.040 (Cat HB) <br />Dump target : Nominal target 0.000 (Cat HB) <br /> Net cycle time adjustment : -0.070 minutes <br /> Adjusted loader cycle time (total time per loader pass) : 0.555 minutes <br /> Net load time per truck * : 1.210 minutes <br />Truck Cycle Time : ~ bulk of 1st loader cycle completed during truck exchange if adj. loader cycle time < exchange time <br />Truck exchange time **: 0.70 minutes........ Adjusted for site altitude : 0.700 minutes <br />Truck load time: 1.210 minutes........ Adjusted for site altitude : 1.210 minutes <br />Truck maneuver and dump time: 1.10 minutes........ Adjusted for site altitude : 1.100 minutes <br />"set at 0 if exchange time < adj. loader cycle time (truck exchange completed during 1st loader cycle) <br />Truck travel (haul & return) time: Road condition :Finn, smooth, rolling, dirt/It. surfaced, watered, maintained <br />Haul route <br />Road <br />segment# Haul distance Grade <br />res. (%) Rolling <br />res. (%) Total <br />resistance (%) Speed Travel time * <br />(minutes) <br />1 800 -6.00 3.00 -3.00 3512 0.290 <br />2 3, 500 16.00 3.00 19.00 437 7.385 <br /> <br /> <br /> <br /> <br /> <br /> <br />Return route <br />Haul time ** : 7.676 minutes <br />1 3,500 -16.00 3.00 -13.00 1920 1.879 <br />2 800 6.00 3.00 9.00 2196 0.344 <br /> <br /> <br /> <br /> <br /> <br /> <br />travel time shown for each segment includes acceleratioNdeceleration adjustment Return time**: 2.223 minutes <br />"total haul and return time shown includes altitude adjustment Total truck cycle time : 12.909 minutes <br />Loading tool unit production : 1,166.23 LCY/hour...... Adjusted for job efficiency : 967.97 LCY/hour <br />Truck unit production : 172.55 LCY/hour...... Adjusted for job efficiency : 143.22 LCY/hour <br />Optimal no. trucks/loading tool : 7 trucks........... Selected no. trucks/loader : 5 trucks <br /> Adjusted hourly truck team production : 716.09 LCY/hr <br /> Adjusted hourly single truck/loader team production : 716.09 LCY/hr <br /> Adjusted hourly multiple truck/loader team production : 716.09 LCY/hr <br /> <br />JOB TIME AND COST <br />Fleet size : 1 Team(s) Total job time : 25.81 Hours <br />Unit cost : $2.389 /LCY Total job cost : $44,156 <br /> <br />