Laserfiche WebLink
sheet 1 of 2 <br />Permit or other job action :Partial Phase I Bond Release SL-03 <br />Task description :Haul Fill from ROM Area to Portal Zone 4-C <br />HOURLY EQUIPMENT COST <br />iipment Description <br />Shift basis : 1 perdaY <br />Truck/loader team -Truck <br />-Loader <br />Support equipment -Load area <br />-Dump area <br />Road maintenance -Motor grader <br />-Water truck <br />` 773D (2002) <br />T 990 Series 11(2005) <br />` D 10R - 10SU (2005) <br />` D 10R - 10SU (2005) <br />T 14H <br />ter Tanker. 5.000 Gal. <br />Cost Breakdown : Truck/Loader Work Team <br />Truck Loading Tool Support Equipment <br />Load Area Dump Area Road Maintenance Equipment <br />Motor Grader Water Truck <br />Import data filename : truck2 loader dozer dozer grader misctruk <br />Utilization-machine : 100 74 100 100 50 50 <br />-Ripper attachment : NA NA 0 0 0 NA <br />Ownership cosUhour : $52.49 $105.80 $84.86 $84.86 $39.60 $21.89 <br />Operating cosUhour : $88.21 $86.37 $138.49 $138.49 $24.26 $17.36 <br />Ripper op. cosUhour : NA NA $0.00 $0.00 $0.00 $0.00 <br />Operator cosUhour : $21.72 $32.96 $32.78 $32.78 $24.47 $33.94 <br />Unit subtotals : $162.42 $225.14 $256.13 $256.13 $88.32 $73.19 <br />Number of units : 5 1 1 1 1 1 <br />Group subtotals : Work : $1,037.22 Support : $512.26 Maintenance : $161.52 <br />Total work team cost/hour : $1,711.00 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 15,863 CCY factor : 1.165 volume : 18,480 LCY <br />Material weight : 2,900 pounds/LCY Struck volume : 33.80 LCY <br />Descr.: Decomposed rock - 50% Rock, 50% Earth Heaped volume : 45.90 LCY <br />Rated payload : 108,060 pounds Average volume : 39.85 LCY <br />Payload capacity : 37.26 LCY Adjusted volume": 37.26 LCY <br /> Final truck volume based on number of loader passes : 37.13 LCY <br /> 'truck volume adjusted to not exceed rated payload or heaped volume <br />Loading Tool Caaacity : Job Condition Corrections : Site altitude (ft.) : 7,100 <br />Rated capacity (nom. heaped) : 11.250 LCY Truck Loader Source <br />Descr.: Other - rock/dirt mixtures (100-120%) Altitude adj.: 1.000 1.000 (Cat HB) <br />Bucket fill factor : 1.100 Job efficiency : 0.830 0.830 (1 shift/day <br />Adjusted bucket capacity : 12.375 LCY Net correction : 0.830 0.830 <br />