III. COMMENTS - COMPLIANCE <br /> Eagle Mines C-1981-044 <br /> 21 May 2008 e�z� <br /> Pg2/3 <br /> Hydrologic Balance (cont.): - Sediment Ponds 9-P2 and 9-P3 are a series of ponds on <br /> the east side of the site for old, reclaimed areas. Pond 9-P2 contained some water <br /> and Pond 9-P3 was dry (only Pond 9-P3 is an NPDES discharge point). Both pond <br /> embankments were well vegetated and appeared to be stable at the time of the <br /> inspection. No erosional problems were noted on either pond embankment at the <br /> time of the inspection. There is a belt-lined ditch that connects the two ponds. This <br /> ditch appeared to be stable at the time of the inspection. <br /> - Sediment Ponds SH-PI and SH-P2, by the old farm shop, were both dry at the time of <br /> the inspection. Both embankments were well vegetated and appeared to be <br /> stable. No erosional problems were noted on either pond embankment at the time <br /> of the inspection. <br /> - Sediment Pond 5A-P 1, just below the 5A portals, contained a small amount of water <br /> at the time of the inspection. The pond embankment was well vegetated and <br /> appeared to be stable. No erosional problems were noted on the pond <br /> embankment at the time of the inspection. The ditch from the 100,000 gallon water <br /> tank above the portal bench appeared to be stable as well. <br /> - Sediment Ponds 9-P 1 and 9-P6, by the newly permitted solid waste disposal area, <br /> were both dry at the time of the inspection. These ponds collect the runoff from the <br /> solid waste disposal area and the adjacent refuse pile. Both pond embankments <br /> were well vegetated and appeared to be stable. No erosional problems were noted <br /> on either pond embankment at the time of the inspection. <br /> - Sediment Pond HR-P-1 b (and its presettling cell HR-P-1 a) contained a small amount <br /> of water at the time of the inspection. Discharge from this pond is through a gated <br /> valve, which was closed at the time of the inspection. The pond embankment was <br /> well vegetated and appeared to be stable. No erosional problems were noted on <br /> the pond embankment at the time of the inspection. <br /> Backfilling and Grading: - The backfilled #4 portal area appeared to be stable at the <br /> time of the inspection. There was no noticeable settling and there were no erosional <br /> problems. <br /> - The solid waste disposal area where several demolished buildings have been buried <br /> has been backfilled. The area was well graded and there was no settling in the <br /> backfill. This area was just backfilled so it will be watched closely. It appears that less <br /> than half of the permitted area has been disturbed. <br /> Processing Waste: - The refuse pile by the solid waste disposal area was well graded <br /> and appeared to be stable at the time of the inspection. The pile appears to have <br /> positive drainage and there was no water pooling on the surface of the pile. There <br /> were no erosional problems noted at the time of the inspection. <br /> Support Facilities: - The 5A portal area appeared to be in good condition at the time <br /> of the inspection. No problems were noted. <br /> - The scoria pit area was stable at the time of the inspection. <br />