My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
_INSPECTION - C1981019 (48)
DRMS
>
Day Forward
>
Inspection
>
Coal
>
C1981019
>
_INSPECTION - C1981019 (48)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/6/2020 2:47:15 PM
Creation date
6/4/2008 10:29:44 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
INSPECTION
Doc Name
Inspection Report
Inspection Date
5/20/2008
Email Name
JRS
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Colowyo C-1981-019 <br /> 20 May 2008 <br /> Pg 5/5 <br /> General Mine Plan Compliance (cont.): - The 114 shovel operation was currently <br /> working on the box-cut area of the South Taylor Pit. <br /> - The 115 excavator was also working on the box-cut area of the South Taylor Pit. <br /> - The mining at the Colowyo Mine appears to be progressing as discussed and <br /> approved in the PAP. <br /> Air Resource Protection: - The mine was very wet on 26 February 2008 so there was no <br /> problem with fugitive dust. The majority of the haul roads had dried out by 27 <br /> February 2008 so there was some dust being generated. Please remember that even <br /> though it is winter, it may still be necessary to water the haul roads, as conditions <br /> dictate. <br /> Excess Spoil: - The reclaimed portions of the West Pit fill were well vegetated and <br /> appeared to be stable at the time of the inspection. There were no erosional <br /> problems noted on the fill. The top 75 feet of the fill (approximately) will need to be <br /> removed and hauled into the West Pit to achieve AOC and the approved PMT. <br /> - The Streeter fill was well vegetated and appeared to be stable at the time of the <br /> inspection. No erosional problems were noted on the fill. This pile has gone through <br /> a Phase II bond release. The fill was well vegetated at the time of the inspection. <br /> - The Section 16 fill was inaccessible at the time of the inspection due to mud. The <br /> pile should be accessible in June. <br /> - The operator has begun construction on portions of the East Taylor fill. The area is <br /> clear of topsoil and ready for fill. The underdrain location has been constructed and <br /> Colowyo is waiting to get into more competent and larger rock before starting to <br /> dump into the fill. The underdrain will be constructed using gravity-sorted rock that <br /> will be wing-dumped into the fill. The large rock will then be covered with filter fabric <br /> then the excess spoil. It is anticipated that the underdrain will be completed in <br /> stages as competent rock is encountered. <br /> Overall, the operations and reclamation at the Colowyo Mine are being conducted <br /> in accordance with the approved plans contained within the PAP. The operation is <br /> doing a good job ensuring compliance with all of the Rules. <br /> I�� <br />