Laserfiche WebLink
page 2 <br /> SUMMARY <br /> We believe that these four test sections will represent typical <br /> situations in Coal Basin and there location will expedite mainte- <br /> nancece and monitoring. All four test sections were seeded and <br /> mulched following the Geo-Hydro suggested construction technique- <br /> s . After completion a large (appro. 2 . 3 acre feet) catchment <br /> basin was constructed to pick up any additional sediment created <br /> by the new construction. the basin will also pick up most of <br /> the sediment from the north fill of the #4 Mine main pad. these <br /> test sections will be monitored annually for stability, erosion <br /> and these generalneeded l basis Possible <br /> An annual modifications <br /> m <br /> ay be will be imple- <br /> mented mented oil an as <br /> to MLR. <br /> Please contact me if you have any questions regarding this project. <br /> Sincerely <br /> Environmental Coordinator <br /> I <br />