My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1987-12-01_PERMIT FILE - C1981017 (286)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981017
>
1987-12-01_PERMIT FILE - C1981017 (286)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/4/2021 7:10:48 AM
Creation date
6/3/2008 10:52:46 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981017
IBM Index Class Name
PERMIT FILE
Doc Date
12/1/1987
Section_Exhibit Name
Chapter V Table of Contents
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Chapter V <br /> SEED LIST. <br /> NEW REFUSE PILE (SUTEY PROPERTY) <br /> GRASSES LB/AC. <br /> Timothy* 3 <br /> Orchard grass* 5 <br /> Western Wheatgrass* 4 <br /> Slender Wheatgrass 4 <br /> Mountain Brome 5 <br /> Kentucky Blue Grass 4 <br /> Tufted Hairgrass 2 <br /> FORBS LB/AC, <br /> White Clover* 1 <br /> Cicer Milkvetch* 1 1/4 <br /> Rocky Mountain Penstemon 1/4 <br /> Western Yarrow 1/4 <br /> Lewis Flax 1/4 <br /> • 30 LB/AC. <br /> * Introduced species from domestic grazing. <br /> It should be noted that Mid-Continent has studied and discussed possible use of the <br /> waste material in both the Sutey pile and the old refuse piles for a small electric <br /> power plant. The idea is attractive to us in that it would allow use of the material, <br /> and the piles would diminish until consumed. The refuse conveyor belt carrying <br /> material to the Sutey site would be reversed, and material would be carried back to <br /> the central complex, the proposed site of the plant, for consumption. <br /> Mid-Continent remains interested in the possibility of such a facility, although there <br /> are no firm plans for construction at this time. <br /> b. Adit/Rock Tunnel Pad and Refuse Pile. <br /> The fill area on the south side of the road at the adit/rock tunnel portals was <br /> completed in 1987. <br /> Topsoil will be replaced on the outslopes in the summer of 1988. <br /> This area will be seeded and mulched in the fall of 1988. <br /> 16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.