Laserfiche WebLink
D. RECLAMATION BY AREA: Past; Interim; Final. 10 <br /> 1. Past. 10 <br /> a. General. 10 <br /> J b. Old Coal Refuse Pile. 10- <br /> c. Haul Roads. 11 <br /> d. Portal Benches. 12 <br /> e. Sutey Refuse Pile. 12 <br /> f. Adit/Rock Tunnel Area. 13 <br /> 2. Interim Reclamation. 13 <br /> a. Sutey Refuse Pile. 13 <br /> b. Adit/Rock Tunnel Pad Refuse Pile. 16 <br /> c. Haul Roads. 17 <br /> d. Portal Benches. 19 <br /> e. Solid Waste Disposal Area. 19 <br /> 3. Final Reclamation. 20 <br /> a. Portal Areas - #1,#2,#3,#4,#5. 20 <br /> b. Haul Roads. 21 <br /> c. Adit/Rock Tunnel Area. 24 <br /> d. Preparation Plant Area. 25 <br /> e. Sutey Refuse Disposal Area. 26 <br /> E. RECLAMATION PRACTICES. 27 <br /> 1. Backfill and Grading Operations. 27- <br /> a. General. 27 <br /> ti b. Portal Benches and Roads. 28 <br /> c. Final Contours. 32 <br /> 2. Topsoil Handling Procedures. 32 <br /> a. Methods of Stripping. 32 <br /> b. Topsoil Stockpile. 33 <br /> c. Redistribution. 34 <br /> d. Reconditioning. 34 <br /> 3. Revegetation Procedures. 35 <br /> a. General Description. 35 <br /> b. Revegetation Schedule. 36 <br /> c. Vegetation Species, Amounts, Planting, <br /> Maintenance. 37 <br /> d. Mulching Techniques. 38 <br /> e. Irrigation. 38 <br /> f. Pest and Disease Control. 38 <br /> g. Methods to Determine Success of <br /> Revegetation. 38 <br /> h. Soil Testing Plan for Evaluation of <br /> Revegetation Procedures. 40 <br /> 4. Rills and Gullies. 40 <br /> _mac- <br />