Laserfiche WebLink
H <br /> COAL BASIN MINE PERMIT RENEWAL APPLICAT:I N <br /> MID-CONTINENT RESOURCES, INC. <br /> CARBONDALE, COLORADO <br /> CHAPTER V <br /> RECLAMATION PLAN <br /> Table of Contents <br /> Section Subject Rage <br /> A. INTRODUCTION 1 <br /> B. GENERAL PLAN 2 <br /> C. DETAILED TIMETABLE FOR THE COMPLETION OF EACH MAJOR <br /> STEP IN THE RECLAMATION PLAN 4 <br /> 1. Disturbed Areas. 4 <br /> �A 2. Major Reclamation Steps and Timetable. 5 <br /> a. Past Reclamation. 5 <br /> (1) General Clean-up. 5 <br /> (2) Grading. 5 <br /> (3) Topsoil Salvage. 6 <br /> (4) Topsoil Replacement. 6 <br /> (5) Planting & Revegetation. 6 <br /> b. Interim Reclamation. 6 <br /> (1) General Clean-up. 6 <br /> (2) Grading. 7 <br /> (3) Topsoil Salvage. 7 <br /> (4) Topsoil Replacement. 7 <br /> (5) Revegetation. 7 <br /> (6) Maintenance 7 <br /> c. Final Reclamation. 8 <br /> (1) Sealing Portals and Shafts. 8 <br /> (2) Removal of Structures. 8 <br /> (3) Backfill and Grading. 9 <br /> (4) Topsoil Replacement. 9 <br /> (5) Revegetation. 9 <br /> i <br />