My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1987-12-01_PERMIT FILE - C1981017 (286)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981017
>
1987-12-01_PERMIT FILE - C1981017 (286)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/4/2021 7:10:48 AM
Creation date
6/3/2008 10:52:46 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981017
IBM Index Class Name
PERMIT FILE
Doc Date
12/1/1987
Section_Exhibit Name
Chapter V Table of Contents
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Chapter V <br /> Phase I: The capacity of the pile in Phase I is approximately 875,000 <br /> cu. yds. of refuse. The total disturbed area of this phase is 15.8 <br /> ` acres. The pile has nearly reached the Phase 1 capacity at the time <br /> of permit submittal. <br /> Two sediment ponds were designed and constructed to handle <br /> Phases I and II. <br /> Phase II: Expands the pile to handle a total of 1,700,000 cu. yds. <br /> The additional disturbed area is 14 acres. <br /> Phase III: Expands the Sutey refuse disposal area an additional <br /> 11.1 acres, increasing pile capacity to approximately 7,800,000 <br /> cu. yds. <br /> It is anticipated this will provide sufficient capacity for 7 to 10 years <br /> of waste. <br /> The refuse conveyor will be extended an additional 1,150' north of <br /> the existing, Phase I pile, with an additional 5.3 acres of disturbed area. <br /> A third sediment pond will be constructed for Phase III. <br /> • Phase IV: The final phase will provide sufficient capacity for refuse <br /> generated to the end of the mine life. <br /> An additional sediment pond will be constructed for Phase IV. <br /> Permit approval will be requested as the pile is reaching the <br /> Phase III capacity. <br /> *Note: The operator feels that references in previous submittals concerning the <br /> Sutey site have become somewhat confusing in that the four phases of the Sutey <br /> pile expansion have been labeled Phases I and Il of the first phase, and Phases I <br /> and II of the second phase. <br /> For this permit submittal, and in future communications, the operator will refer to the <br /> four phases, as follows: <br /> Phase I was approved as a Permit Revision in September, 1984. <br /> Phase II was approved as a Technical Revision in July, 1986. <br /> Phase 111 was approved as Phase I of a Technical Revision in September, 1987. <br /> Phase IV(Phase/1 of the 1987 TR) has not been permitted. , <br /> Reclamation of the Sutey pile will begin with the outslopes and will, essentially, <br /> follow along as the active deposition of refuse progresses to other areas. <br /> 14 <br />